Council archive · source document
08/1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published] · 142008.1041
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
S E CTI ON 5 The following question onty applies when the application is seeking approval to carry out building work to the
extent the work is in a declared fish habitat area.
DECLARED FISH HABITAT AREA
5.1
ts the proposed building work in a declared fish habitat area uncer the Fisheries Act 1994?
LI No - Ena of Section 5 O Yes
_ lfyes, is the proposed building work reasonably necessary for: (Tick applicable box‘es and answer (a) and/or (b) below)
(i) The maintenance of existing structures. including for example the following structures, if the (no (1) Yes
structures were constructed in compliance with all the requirements. under any Act, relating to a
structure of that type -
* Boat ramps, boardwaiks, drains, fences, jetties, roads, safety signs, swimming enclosures and
weirs;
« — Existing powerlines: or associated powerline infrastructure - ; ; _
: (ii) ‘Educational or research purposes rel relating to the fish} habitat area __. i OO No O Yes
(iii) Monitoring the impact of development on the declared fish habitat area Tt) No (J Yes
i (iv) The construction of structures, including, for example, safely signs, swimming enclosures and aids o No LC Yes
to navigation, if -
+ The impact on the area is minor; and
+ The structures are constructed in compliance with all the requirements, under any Act, relating to
a structure of that type
(a) If yes to one or more of (i) - (wv) above, does all the proposed building work comply with any applicable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
1 Yes - A pert for that aspect of the building work is not requited. End of Section § — [_] No ~ Goto (b)
(b) If no to all of (i) - (iv) or no to (a) above. is that proposed building work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?
oO No - (Complete Form 1, Part 0.) This application requires assessment by the Oepartment of Primary Industries and Fishenes (DPI&F). If DPI&F is
not the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency. End of Secton 5
OO Yes
if yes, is all of the building work for specified works under the Wild Rivers Act 2005?
Yes - Uniess the application is consistent with any property development plan applying fo the land, the assessment manager must refuse (0
receive it. (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary industries and Fisheries
(DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild River Act 2008. If
DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. End of Section 5
CINo
If no, is any of the proposed building work to be carried out in a wild river high preservation area?
oO No - Unless the application is consistent with any property development plan applying to the land, ihe assessment manager mus?
refuse to receive it. (Complete Form 1. Part 02) This application requires assessment by the Department of Primary indusiries
and Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild
River Act 2008. if DPI&F is not the Assessment Manager for the application, the agency has jurisdichon as Concurrence
Agency. End of Section 5
oO Yes - An apptication for the building work will be taken to be not properly made and the assessment manager must refuse to recetve
it, End of Sechon 5
ane sees PA nlgton
Page 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.