State code 6: Protection of state transport networks
Table 6.2.2: All development
  Performance outcomes                                          Acceptable outcomes                    Response
  Network impacts
  PO1 Development does not result in a worsening of the         No acceptable outcome is prescribed.   Complies with PO1 - The Traffic Engineering
  safety of a state-controlled road.                                                                   Assessment prepared by Traffic and Transport Plus
                                                                                                       (refer Appendix F) has confirmed that the additional
  Note: To demonstrate compliance with this performance                                                traffic generated (associated with the proposed hotel)
  outcome, it is recommended that a Registered Professional
  Engineer of Queensland (RPEQ) certified road safety audit
                                                                                                       would be significantly less than 5% of the Base Traffic
  or road safety assessment (as applicable) is provided.                                               Volumes on the approaches to the roundabout in
                                                                                                       2023 (the opening year of the site).
  Further information on determining whether a road safety
  audit or road safety assessment is required is provided in                                           The additional traffic expected to be generated by the
  section 9 of the Guide to Traffic Impact Assessment,                                                 proposed development will have a negligible impact
  Department of Transport and Main Roads, 2017.                                                        on the operation of the Leslie Drive / Cooyar Street /
                                                                                                       Tarina Street / Noosa Springs Drive roundabout
                                                                                                       intersection, and surrounding road network, which will
                                                                                                       continue to operate well within acceptable capacity
                                                                                                       thresholds.

  PO2 Development does not result in a worsening of the         No acceptable outcome is prescribed.   Complies with PO2 – Given the advice provided
  infrastructure condition of a state-controlled road or road                                          above, the proposed development will not have a
  transport infrastructure.                                                                            measurable impact upon the state-controlled or road
                                                                                                       transport infrastructure.
  Note: To demonstrate compliance with this performance
  outcome, it is recommended that a RPEQ certified traffic
  impact assessment and pavement impact assessment are
  provided.

  Further information on how to prepare a traffic impact
  assessment and pavement impact assessment is provided
  in the Guide to Traffic Impact Assessment, Department of
  Transport and Main Roads, 2017.
  PO3 Development does not result in a worsening of             No acceptable outcome is prescribed.   Complies with PO3 – The advice provided above,
  operating conditions on a state-controlled road or the                                               proposed development will not result in a worsening
  surrounding road network.                                                                            of operating conditions on a state-controlled road or
                                                                                                       the surrounding road network.
  Note: To demonstrate compliance with this performance
  outcome,



State Development Assessment Provisions – version 2.6
State code 6: Protection of state transport networks                                                                                  Page 1 of 10


[OCR of page images]
State code 6: Protection of state transport networks

Table 6.2.2: All develooment
eae Le mel el Coxe} Acceptable outcomes

Network impacts

cos

 

PO1 Development does not result in a worsening of the
safety of a state-controlled road.

Note: To demonstrate compliance with this performance
outcome, it is recommended that a Registered Professional
Engineer of Queensland (RPEQ) certified road safety audit
or road safety assessment (as applicable) is provided.

Further information on determining whether a road safety
audit or road safety assessment is required is provided in
section 9 of the Guide to Traffic Impact Assessment,
Department of Transport and Main Roads, 2017.

No acceptable outcome is prescribed.

Complies with PO1 - The Traffic Engineering
Assessment prepared by Traffic and Transport Plus
(refer Appendix F) has confirmed that the additional
traffic generated (associated with the proposed hotel)
would be significantly less than 5% of the Base Traffic
Volumes on the approaches to the roundabout in
2023 (the opening year of the site).

The additional traffic expected to be generated by the
proposed development will have a negligible impact
on the operation of the Leslie Drive / Cooyar Street /
Tarina Street / Noosa Springs Drive roundabout
intersection, and surrounding road network, which will
continue to operate well within acceptable capacity
thresholds.

 

PO2 Development does not result in a worsening of the
infrastructure condition of a state-controlled road or road
transport infrastructure.

Note: To demonstrate compliance with this performance
outcome, it is recommended that a RPEQ certified traffic
impact assessment and pavement impact assessment are
provided.

Further information on how to prepare a traffic impact
assessment and pavement impact assessment is provided
in the Guide to Traffic Impact Assessment, Department of
Transport and Main Roads, 2017.

No acceptable outcome is prescribed.

Complies with PO2 — Given the advice provided
above, the proposed development will not have a
measurable impact upon the state-controlled or road
transport infrastructure.

 

PO3 Development does not result in a worsening of
operating conditions on a state-controlled road or the
surrounding road network.

Note: To demonstrate compliance with this performance
outcome,

 

 

No acceptable outcome is prescribed.

 

Complies with PO3 — The advice provided above,
proposed development will not result in a worsening
of operating conditions on a state-controlled road or
the surrounding road network.

 

State Development Assessment Provisions — version 2.6
State code 6: Protection of state transport networks

Page 1 of 10

 

Log in to download the original (Attachment 3 - State Development Assessment Provisions.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 11 pages

Page 2

  Performance outcomes                                       Acceptable outcomes                                        Response
  it is recommended that an RPEQ certified traffic impact
  assessment is provided.

  Further information on how to prepare a traffic impact
  assessment
  is provided in the Guide to Traffic Impact Assessment,
  Department of Transport and Main Roads, 2017.
  PO4 Development does not impose traffic loadings on a      AO4.1 The layout and design of the development             Complies with PO4 – All of the traffic associated with
  state-controlled road which could be accommodated on the   directs traffic generated by the development to the        the development is directed to the local road network.
  local road network.                                        local road network.
  PO5 Upgrade works on, or associated with, a state-         AO5.1 Upgrade works on a state-controlled road are         Not applicable – no road works are required.
  controlled road are built in accordance with relevant      designed and constructed in accordance with the
  design standards.                                          Road Planning and Design Manual, 2nd edition,
                                                             Department of Transport and Main Roads, 2016.
  PO6 Development involving the haulage of fill, extracted   AO6.1 Fill, extracted material and spoil material is not   Not Applicable
  material or excavated spoil material exceeding 10,000      transported to or from the development site on a
  tonnes per year does not damage the pavement of a state-   state-controlled road.
  controlled road.

  Note: It is recommended that a transport infrastructure
  impact assessment and pavement impact assessment are
  provided.

  Further information on how to prepare a traffic impact
  assessment is provided in the Guide to Traffic Impact
  Assessment, Department of Transport and Main Roads,
  2017.
  PO7 Development does not adversely impact on the safety    AO7.1 Development does not require a new railway           Not Applicable
  of a railway crossing.                                     crossing.

  Note: It is recommended that a traffic impact assessment   OR
  be prepared to demonstrate compliance with this
  performance outcome. An impact on a level crossing may     AO7.2 A new railway crossing is grade separated.           Not Applicable
  require an Australian Level Crossing Assessment Model
  (ALCAM) assessment to be undertaken. Section 2.2 –                                                                    Not Applicable
  Railway crossing safety of the Guide to Development in a   OR all of the following acceptable outcomes apply:
  Transport Environment: Rail, Department of Transport and
  Main Roads, 2015, provides guidance on how to comply       AO7.3 Upgrades to a level crossing are designed and
  with this performance outcome.                             constructed in accordance with AS1742.7 – Manual of
                                                             uniform traffic control devices, Part 7: Railway
                                                             crossings and applicable rail manager standard
                                                             drawings.




State Development Assessment Provisions – version 2.6
State code 6: Protection of state transport networks                                                                                                   Page 2 of 10


[OCR of page images]
Performance outcomes

it is recommended that an RPEQ certified traffic impact
assessment is provided.

Further information on how to prepare a traffic impact
assessment

is provided in the Guide to Traffic Impact Assessment,
Department of Transport and Main Roads, 2017.

Acceptable outcomes

| Response

 

PO4 Development does not impose traffic loadings on a
state-controlled road which could be accommodated on the
local road network.

AO4.1 The layout and design of the development
directs traffic generated by the development to the
local road network.

Complies with PO4 — All of the traffic associated with
the development is directed to the local road network.

 

PO5 Upgrade works on, or associated with, a state-
controlled road are built in accordance with relevant
design standards.

AO5.1 Upgrade works on a state-controlled road are
designed and constructed in accordance with the
Road Planning and Design Manual, 2nd edition,
Department of Transport and Main Roads, 2016.

Not applicable — no road works are required.

 

PO6 Development involving the haulage of fill, extracted
material or excavated spoil material exceeding 10,000
tonnes per year does not damage the pavement of a state-
controlled road.

Note: It is recommended that a transport infrastructure
impact assessment and pavement impact assessment are
provided.

Further information on how to prepare a traffic impact
assessment is provided in the Guide to Traffic Impact
Assessment, Department of Transport and Main Roads,
2017.

AO6.1 Fill, extracted material and spoil material is not
transported to or from the development site on a
state-controlled road.

Not Applicable

 

PO7 Development does not adversely impact on the safety
of a railway crossing.

Note: It is recommended that a traffic impact assessment
be prepared to demonstrate compliance with this
performance outcome. An impact on a level crossing may
require an Australian Level Crossing Assessment Model
(ALCAM) assessment to be undertaken. Section 2.2 —
Railway crossing safety of the Guide to Development in a
Transport Environment: Rail, Department of Transport and
Main Roads, 2015, provides guidance on how to comply
with this performance outcome.

 

AO7.1 Development does not require a new railway
crossing.

OR

Not Applicable

 

AO7.2 A new railway crossing is grade separated.

Not Applicable

 

 

OR all of the following acceptable outcomes apply:

AO7.3 Upgrades to a level crossing are designed and
constructed in accordance with AS1742.7 — Manual of
uniform traffic control devices, Part 7: Railway
crossings and applicable rail manager standard
drawings.

Not Applicable

 

 

State Development Assessment Provisions — version 2.6
State code 6: Protection of state transport networks

Page 2 of 10

 

Page 3

  Performance outcomes                                      Acceptable outcomes                                       Response
                                                            Note: It is recommended a traffic impact assessment be
                                                            prepared to demonstrate compliance with this
                                                            acceptable outcome. An impact on a level crossing may
                                                            require an Australian Level Crossing Assessment
                                                            Model (ALCAM) assessment to be undertaken. Section
                                                            2.2 – Railway crossing safety of the Guide to
                                                            Development in a Transport Environment: Rail,
                                                            Department of Transport and Main Roads, 2015,
                                                            provides guidance on how to comply with this
                                                            acceptable outcome


                                                            AND

                                                            AO7.4 Access points achieve sufficient clearance from     Not Applicable
                                                            a level crossing in accordance with AS1742.7 – Manual
                                                            of uniform traffic control devices, Part 7: Railway
                                                            crossings by providing a minimum clearance of 5
                                                            metres from the edge running rail (outer rail) plus the
                                                            length of the largest vehicle anticipated on-site.

                                                            Note: Section 2.2 of the Guide to Development in a
                                                            Transport Environment: Rail, Department of Transport
                                                            and Main Roads, 2015, provides guidance on how to
                                                            comply with this acceptable outcome.

                                                            AND

                                                            AO7.5 On-site vehicle circulation is designed to give     Not Applicable
                                                            priority to entering vehicles at all times.
  PO8 Development does not result in a worsening of the     No acceptable outcome is prescribed.                      Not Applicable
  infrastructure condition of a railway or rail transport
  infrastructure.
  PO9 Development does not result in a worsening of         No acceptable outcome is prescribed.                      Not Applicable
  operating conditions of a railway
  Stormwater and drainage

  PO10 Development does not result in an actionable         No acceptable outcome is prescribed.                      Complies with PO10 – Stormwater from the proposed
  nuisance, or worsening of, stormwater, flooding or                                                                  development will have no impact upon the state
  drainage impacts in a state transport corridor or state                                                             corridor or state transport infrastructure (refer
  transport infrastructure.                                                                                           Engineering Report - Appendix D).
  PO11 Run-off from the development site is not             AO11.1 Development does not create any new                Complies with PO11 – Refer above
                                                            points of discharge to a state transport corridor.



State Development Assessment Provisions – version 2.6
State code 6: Protection of state transport networks                                                                                              Page 3 of 10


[OCR of page images]
Pea COELI Le mel UL Corel}

Acceptable outcomes

Note: It is recommended a traffic impact assessment be
prepared to demonstrate compliance with this
acceptable outcome. An impact on a level crossing may
require an Australian Level Crossing Assessment
Model (ALCAM) assessment to be undertaken. Section
2.2 — Railway crossing safety of the Guide to
Development in a Transport Environment: Rail,
Department of Transport and Main Roads, 2015,
provides guidance on how to comply with this
acceptable outcome

AND

| Response

 

AO7.4 Access points achieve sufficient clearance from
a level crossing in accordance with AS1742.7 — Manual
of uniform traffic control devices, Part 7: Railway
crossings by providing a minimum clearance of 5
metres from the edge running rail (outer rail) plus the
length of the largest vehicle anticipated on-site.

Note: Section 2.2 of the Guide to Development in a
Transport Environment: Rail, Department of Transport
and Main Roads, 2015, provides guidance on how to
comply with this acceptable outcome.

AND

Not Applicable

 

AO7.5 On-site vehicle circulation is designed to give
priority to entering vehicles at all times.

Not Applicable

 

PO8 Development does not result in a worsening of the
infrastructure condition of a railway or rail transport
infrastructure.

No acceptable outcome is prescribed.

Not Applicable

 

PO9 Development does not result in a worsening of
operating conditions of a railway

No acceptable outcome is prescribed.

Not Applicable

 

Stormwater and drainage

 

PO10 Development does not result in an actionable
nuisance, or worsening of, stormwater, flooding or
drainage impacts in a state transport corridor or state
transport infrastructure.

No acceptable outcome is prescribed.

Complies with PO10 — Stormwater from the proposed
development will have no impact upon the state
corridor or state transport infrastructure (refer
Engineering Report - Appendix D).

 

PO11 Run-off from the development site is not

 

 

AOQ11.1 Development does not create any new
points of discharge to a state transport corridor.

Complies with PO11 — Refer above

 

 

State Development Assessment Provisions — version 2.6
State code 6: Protection of state transport networks

Page 3 of 10

 

Page 4

  Performance outcomes                                       Acceptable outcomes                                              Response
  unlawfully discharged to a state transport corridor or     AND
  state transport infrastructure.                            AO11.2 Stormwater run-off is discharged to a lawful              N/A – Refer above
                                                             point of discharge.

                                                             Note: Section 3.49 of the Queensland Urban
                                                             Drainage Manual,
                                                             Institute of Public Works Engineering Australasia
                                                             (Queensland Division) Fourth Edition, 2016, provides
                                                             further information on lawful points of discharge.
                                                             AND
                                                             AO11.3 Development does not worsen the condition                 N/A – Refer above
                                                             of an existing lawful point of discharge to a state
                                                             transport corridor.
  PO12 Run-off from the development site does not            AO12.1 Run-off from the development site is not                  N/A – Refer above
  cause siltation of stormwater infrastructure affecting a   discharged to stormwater infrastructure for a state
  state transport corridor or state transport                transport corridor.
  infrastructure.
  Planned upgrades
  PO13 Development does not impede delivery of               AO13.1 Development is not located on land                        Complies PO13 – The proposed development will not
  planned upgrades of state transport                        identified by the Department of Transport and Main               affect planned upgrades of state transport
  infrastructure.                                            Roads as land required for the planned upgrade of                infrastructure.
                                                             state transport infrastructure.

                                                             Note: Land required for the planned upgrade of state transport
                                                             infrastructure is identified in the DA mapping system.

                                                             OR
                                                             AO13.2 Development is sited and designed so that                 N/A – Refer above
                                                             permanent buildings, structures, infrastructure,
                                                             services or utilities are not located on land identified
                                                             by the Department of Transport and Main Roads as
                                                             land required for the planned upgrade of state
                                                             transport infrastructure.
                                                             OR all of the following acceptable outcomes apply:               N/A – Refer above

                                                             AO13.3 Structures and infrastructure located on
                                                             land identified by the Department of Transport and
                                                             Main Roads as land required for the planned
                                                             upgrade of state transport infrastructure are able




State Development Assessment Provisions – version 2.6
State code 6: Protection of state transport networks                                                                                                      Page 4 of 10


[OCR of page images]
Performance outcomes
unlawfully discharged to a state transport corridor or
state transport infrastructure.

Acceptable outcomes
AND

| Response

 

AOQ11.2 Stormwater run-off is discharged to a lawful
point of discharge.

Note: Section 3.49 of the Queensland Urban
Drainage Manual,

Institute of Public Works Engineering Australasia
(Queensland Division) Fourth Edition, 2016, provides
further information on lawful points of discharge.

AND

N/A — Refer above

 

AO11.3 Development does not worsen the condition
of an existing lawful point of discharge to a state
transport corridor.

N/A — Refer above

 

PO12 Run-off from the development site does not
cause siltation of stormwater infrastructure affecting a
state transport corridor or state transport
infrastructure.

AOQ12.1 Run-off from the development site is not
discharged to stormwater infrastructure for a state
transport corridor.

N/A — Refer above

 

Planned upgrades

 

PO13 Development does not impede delivery of
planned upgrades of state transport
infrastructure.

 

AO13.1 Development is not located on land
identified by the Department of Transport and Main
Roads as land required for the planned upgrade of
state transport infrastructure.

Note: Land required for the planned upgrade of state transport
infrastructure is identified in the DA mapping system.

OR

Complies PO13 — The proposed development will not
affect planned upgrades of state transport
infrastructure.

 

AO13.2 Development is sited and designed so that
permanent buildings, structures, infrastructure,
services or utilities are not located on land identified
by the Department of Transport and Main Roads as
land required for the planned upgrade of state
transport infrastructure.

N/A — Refer above

 

 

OR all of the following acceptable outcomes apply:

AO13.3 Structures and infrastructure located on
land identified by the Department of Transport and
Main Roads as land required for the planned
upgrade of state transport infrastructure are able

N/A — Refer above

 

 

State Development Assessment Provisions — version 2.6

State code 6: Protection of state transport networks

Page 4 of 10

 

Page 5

  Performance outcomes                                     Acceptable outcomes                                     Response
                                                           to be readily relocated or removed without materially
                                                           affecting the viability or functionality of the
                                                           development.

                                                           AND
                                                           AO13.4 Vehicular access for the development is          N/A – Refer above
                                                           consistent with the function and design of the
                                                           planned upgrade of state transport infrastructure.

                                                           AND
                                                           AO13.5 Development does not involve filling and         N/A – Refer above
                                                           excavation of, or material changes to, land required
                                                           for a planned upgrade to a state transport
                                                           infrastructure.

                                                           AND
                                                           AO13.6 Land is able to be reinstated to the             N/A – Refer above
                                                           predevelopment condition at the completion of the
                                                           use.

Table 6.2.3: Public passenger transport infrastructure
  Performance outcomes                                     Acceptable outcomes                                     Response
  Public passenger transport infrastructure
  PO14 Development does not damage or interfere            AO14.1 Vehicular access and associated road             Complies with PO14 – The proposed development
  with public passenger transport infrastructure, public   access works are not located within 5 metres of         will not have any impact upon public passenger
  passenger services or pedestrian or cycle access to      public passenger transport infrastructure.              transport infrastructure passenger services or
  public passenger transport infrastructure and public                                                             pedestrian or cycle access to public passenger
  passenger services.                                      AND                                                     transport infrastructure and public passenger services
                                                                                                                   (refer Appendix F).
                                                           AO14.2 Development does not necessitate the             N/A – Refer above
                                                           relocation of existing public passenger transport
                                                           infrastructure.

                                                           AND
                                                           AO14.3 Development does not obstruct pedestrian         N/A – Refer above
                                                           or cyclist access to public passenger transport
                                                           infrastructure or public passenger services.

                                                           AND



State Development Assessment Provisions – version 2.6
State code 6: Protection of state transport networks                                                                                             Page 5 of 10


[OCR of page images]
Pea COELI Le mel UL Corel}

 

Acceptable outcomes

to be readily relocated or removed without materially
affecting the viability or functionality of the
development.

AND

| Response

 

AQ13.4 Vehicular access for the development is
consistent with the function and design of the
planned upgrade of state transport infrastructure.

AND

N/A — Refer above

 

AO13.5 Development does not involve filling and
excavation of, or material changes to, land required
for a planned upgrade to a state transport
infrastructure.

AND

N/A — Refer above

 

 

AO13.6 Land is able to be reinstated to the
predevelopment condition at the completion of the
use.

N/A — Refer above

 

 

Table 6.2.3: Public passenger transport infrastructure
eae Le mel el Coxe}
Public passenger transport infrastructure

Acceptable outcomes

| Response

 

PO14 Development does not damage or interfere
with public passenger transport infrastructure, public
passenger services or pedestrian or cycle access to
public passenger transport infrastructure and public
passenger services.

 

AQ14.1 Vehicular access and associated road
access works are not located within 5 metres of
public passenger transport infrastructure.

AND

Complies with PO14 — The proposed development
will not have any impact upon public passenger
transport infrastructure passenger services or
pedestrian or cycle access to public passenger
transport infrastructure and public passenger services
(refer Appendix F).

 

AO14.2 Development does not necessitate the
relocation of existing public passenger transport
infrastructure.

AND

N/A — Refer above

 

 

AOQ14.3 Development does not obstruct pedestrian
or cyclist access to public passenger transport
infrastructure or public passenger services.

AND

N/A — Refer above

 

 

State Development Assessment Provisions — version 2.6

State code 6: Protection of state transport networks

Page 5 of 10

 

 

Page 6

  Performance outcomes                                    Acceptable outcomes                                     Response
                                                          AO14.4 The normal operation of public passenger
                                                          transport infrastructure or public passenger services
                                                          is not interrupted during construction of the
                                                          development.
  PO15 Upgraded or new public passenger                   No acceptable outcome is prescribed.                    N/A – Refer above
  transport infrastructure is provided to
  accommodate the demand for public passenger
  transport generated by the development.

  Note: To demonstrate compliance with this
  performance outcome,
  it is recommended a public transport impact
  assessment be
  prepared in accordance with appendix 1 of the State
  Development Assessment Provisions Supporting
  Information –
  Public Passenger Transport Infrastructure,
  Department of
  Transport and Main Roads, 2017.

  New or upgraded public passenger transport
  infrastructure
  provided should be in accordance with the Public
  Transport
  Infrastructure Manual, Department of Transport and
  Main Roads,
  2015.

  Refer to the SDAP Supporting Information: Public
  passenger
  transport infrastructure, Department of Transport and
  Main
  Roads, 2017, for further guidance on how to comply
  with the
  performance outcome.
  PO16 Development is designed to ensure the              No acceptable outcome is prescribed.                    N/A – Refer above
  location of public passenger transport infrastructure
  prioritises and enables efficient public passenger
  services.



State Development Assessment Provisions – version 2.6
State code 6: Protection of state transport networks                                                                                  Page 6 of 10


[OCR of page images]
Pea COELI Le mel UL Corel}

Acceptable outcomes

AOQ14.4 The normal operation of public passenger
transport infrastructure or public passenger services
is not interrupted during construction of the
development.

| Response

 

PO15 Upgraded or new public passenger
transport infrastructure is provided to
accommodate the demand for public passenger
transport generated by the development.

Note: To demonstrate compliance with this
performance outcome,

it is recommended a public transport impact
assessment be

prepared in accordance with appendix 1 of the State
Development Assessment Provisions Supporting
Information —

Public Passenger Transport Infrastructure,
Department of

Transport and Main Roads, 2017.

New or upgraded public passenger transport
infrastructure

provided should be in accordance with the Public
Transport

Infrastructure Manual, Department of Transport and
Main Roads,

2015.

Refer to the SDAP Supporting Information: Public
passenger

transport infrastructure, Department of Transport and
Main

Roads, 2017, for further guidance on how to comply
with the

performance outcome.

No acceptable outcome is prescribed.

N/A — Refer above

 

PO16 Development is designed to ensure the
location of public passenger transport infrastructure
prioritises and enables efficient public passenger
services.

 

 

No acceptable outcome is prescribed.

N/A — Refer above

 

 

State Development Assessment Provisions — version 2.6
State code 6: Protection of state transport networks

Page 6 of 10

 

Page 7

  Performance outcomes                                      Acceptable outcomes                                    Response

  Note: Chapters 2 and 5 of the Public Transport
  Infrastructure
  Manual, Department of Transport and Main Roads,
  2015 provides
  guidance on how to comply with this performance
  outcome.

  Refer to the SDAP Supporting Information: Public
  passenger
  transport infrastructure, Department of Transport and
  Main
  Roads, 2017, for further guidance on how to comply
  with the
  performance outcome.
  PO17 Development enables the provision or                 No acceptable outcome is prescribed.                   N/A – Refer above
  extension of public passenger services to the
  development and avoids creating indirect or inefficient
  routes for public passenger services.

  Note: Refer to the SDAP Supporting Information:
  Public
  passenger transport infrastructure, Department of
  Transport and
  Main Roads, 2017, for further guidance on how to
  comply with the
  performance outcome.
  PO18 New or modified road networks are designed           AO18.1 Roads catering for buses are arterial or        N/A – Refer above
  to enable development to be serviced by public            sub-arterial roads, collector or their equivalent.
  passenger services.
                                                            AND
  Note: Refer to the SDAP Supporting Information:
  Public                                                    AO18.2 Roads intended to accommodate buses are         N/A – Refer above
  passenger transport infrastructure, Department of         designed and constructed in accordance with parts 3,
  Transport and                                             4-4C and 6 of the Road Planning and Design Manual
  Main Roads, 2017, for further guidance on how to          2nd edition, Volume 3: Guide to Road Design,
  comply with the                                           Department of Transport and Main Roads, 2016 and
  performance outcome.                                      Part 13 of the Manual of Uniform Traffic Control




State Development Assessment Provisions – version 2.6
State code 6: Protection of state transport networks                                                                                   Page 7 of 10


[OCR of page images]
Performance outcomes

Note: Chapters 2 and 5 of the Public Transport
Infrastructure

Manual, Department of Transport and Main Roads,
2015 provides

guidance on how to comply with this performance
outcome.

Refer to the SDAP Supporting Information: Public
passenger

transport infrastructure, Department of Transport and
Main

Roads, 2017, for further guidance on how to comply
with the

performance outcome.

Acceptable outcomes

| Response

 

PO17 Development enables the provision or
extension of public passenger services to the
development and avoids creating indirect or inefficient
routes for public passenger services.

Note: Refer to the SDAP Supporting Information:
Public

passenger transport infrastructure, Department of
Transport and

Main Roads, 2017, for further guidance on how to
comply with the

performance outcome.

No acceptable outcome is prescribed.

N/A — Refer above

 

PO18 New or modified road networks are designed
to enable development to be serviced by public
passenger services.

Note: Refer to the SDAP Supporting Information:

Public

passenger transport infrastructure, Department of
Transport and

Main Roads, 2017, for further guidance on how to
comply with the

performance outcome.

 

AOQ18.1 Roads catering for buses are arterial or
sub-arterial roads, collector or their equivalent.

AND

N/A — Refer above

 

 

AO18.2 Roads intended to accommodate buses are
designed and constructed in accordance with parts 3,
4-4C and 6 of the Road Planning and Design Manual
2nd edition, Volume 3: Guide to Road Design,
Department of Transport and Main Roads, 2016 and
Part 13 of the Manual of Uniform Traffic Control

N/A — Refer above

 

 

State Development Assessment Provisions — version 2.6
State code 6: Protection of state transport networks

Page 7 of 10

 

Page 8

  Performance outcomes                                     Acceptable outcomes                                      Response
                                                           Devices, Department of Transport and Main Roads,
                                                           2018.

                                                           Note: Parts 3, 4-4C and 6 of the Road Planning and
                                                           Design Manual, Volume 3: Guide to Road Design,
                                                           Department of Transport and Main Roads, 2016, must
                                                           be read in conjunction with the following standards
                                                           where specified in the Manual:

                                                           1. Supplement to Austroads Guide to Road Design
                                                           (Parts 3,4-4C and 6), Department of Transport and
                                                           Main Roads, 2014, and
                                                           2. Austroads Guide to Road Design (Parts 3,4-4C and
                                                           6).

                                                           AND
                                                           AO18.3 Traffic calming devices are not installed on      N/A – Refer above
                                                           roads used for buses.

                                                           Note: Chapter 2 of the Public Transport Infrastructure
                                                           Manual,
                                                           Department of Transport and Main Roads, 2015
                                                           provides
                                                           guidance on how to comply with this acceptable
                                                           outcome.
  PO19 Development provides safe, direct and               No acceptable outcome is prescribed.                     Complies with PO19 – The proposed development
  convenient pedestrian access to existing and future                                                               will not impact upon the safe, direct, and convenient
  public passenger transport infrastructure.                                                                        pedestrian access to existing public passenger
                                                                                                                    transport infrastructure.
  Note: Chapter 3 of the Public Transport Infrastructure
  Manual,
  Department of Transport and Main Roads, 2015
  provides
  guidance on how to comply with this performance
  outcome. In particular, it is recommended that a
  pedestrian demand analysis be provided to
  demonstrate compliance with the performance
  outcome.




State Development Assessment Provisions – version 2.6
State code 6: Protection of state transport networks                                                                                               Page 8 of 10


[OCR of page images]
Pea COELI Le mel UL Corel}

Acceptable outcomes
Devices, Department of Transport and Main Roads,
2018.

Note: Parts 3, 4-4C and 6 of the Road Planning and
Design Manual, Volume 3: Guide to Road Design,
Department of Transport and Main Roads, 2016, must
be read in conjunction with the following standards
where specified in the Manual:

1. Supplement to Austroads Guide to Road Design
(Parts 3,4-4C and 6), Department of Transport and
Main Roads, 2014, and

2. Austroads Guide to Road Design (Parts 3,4-4C and
6).

AND

| Response

 

AO18.3 Traffic calming devices are not installed on
roads used for buses.

Note: Chapter 2 of the Public Transport Infrastructure
Manual,

Department of Transport and Main Roads, 2015
provides

guidance on how to comply with this acceptable
outcome.

N/A — Refer above

 

PO19 Development provides safe, direct and
convenient pedestrian access to existing and future
public passenger transport infrastructure.

Note: Chapter 3 of the Public Transport Infrastructure
Manual,

Department of Transport and Main Roads, 2015
provides

guidance on how to comply with this performance
outcome. In particular, it is recommended that a
pedestrian demand analysis be provided to
demonstrate compliance with the performance
outcome.

 

 

No acceptable outcome is prescribed.

Complies with PO19 — The proposed development
will not impact upon the safe, direct, and convenient
pedestrian access to existing public passenger
transport infrastructure.

 

 

State Development Assessment Provisions — version 2.6
State code 6: Protection of state transport networks

Page 8 of 10

 

Page 9

  Performance outcomes                                    Acceptable outcomes                                   Response
  Refer to the SDAP Supporting Information: Public
  passenger
  transport infrastructure, Department of Transport and
  Main
  Roads, 2017, for further guidance on how to comply
  with the
  performance outcome.
  PO20 On-site vehicular circulation ensures the          AO20.1 The location of on-site pedestrian crossings   N/A – Refer above
  safety of both public passenger transport services      ensures safe sight distances for pedestrians and
  and pedestrians.                                        public passenger services.

  Note: Refer to the SDAP Supporting Information:         AND
  Public passenger transport infrastructure, Department   AO20.2 On-site circulation is designed and            N/A – Refer above
  of Transport and Main Roads, 2017, for further          constructed so that public passenger services can
  guidance on how to comply with the performance          enter and leave in a forward gear at all times.
  outcome.
                                                          AND
                                                          AO20.3 Development does not result in public          N/A – Refer above
                                                          passenger services movements through car parking
                                                          aisles.

  PO21 Taxi facilities are provided to accommodate        No acceptable outcome is prescribed.                  N/A – Refer above
  the demand generated by the development.

  Note: Guidance on how to meet the performance
  outcome are
  available in chapter 7 of the Public Transport
  Infrastructure
  Manual, Department of Transport and Main Roads,
  2015.

  Refer to the SDAP Supporting Information: Public
  passenger
  transport infrastructure, Department of Transport and
  Main
  Roads, 2017, for further guidance on how to comply
  with the
  performance outcome.
  PO22 Taxi facilities are located and designed to        AO22.1 A taxi facility is provided parallel to the    N/A – Refer above
  provide convenient, safe and equitable access for       kerb and adjacent to the main entrance.


State Development Assessment Provisions – version 2.6
State code 6: Protection of state transport networks                                                                                Page 9 of 10


[OCR of page images]
Performance outcomes

Refer to the SDAP Supporting Information: Public
passenger

transport infrastructure, Department of Transport and
Main

Roads, 2017, for further guidance on how to comply
with the

performance outcome.

Acceptable outcomes

| Response

 

PO20 On-site vehicular circulation ensures the
safety of both public passenger transport services
and pedestrians.

Note: Refer to the SDAP Supporting Information:
Public passenger transport infrastructure, Department
of Transport and Main Roads, 2017, for further
guidance on how to comply with the performance
outcome.

AQ20.1 The location of on-site pedestrian crossings
ensures safe sight distances for pedestrians and
public passenger services.

AND

N/A — Refer above

 

AQ20.2 On-site circulation is designed and
constructed so that public passenger services can
enter and leave in a forward gear at all times.

AND

N/A — Refer above

 

AQ20.3 Development does not result in public
passenger services movements through car parking
aisles.

N/A — Refer above

 

PO21 Taxi facilities are provided to accommodate
the demand generated by the development.

Note: Guidance on how to meet the performance
outcome are

available in chapter 7 of the Public Transport
Infrastructure

Manual, Department of Transport and Main Roads,
2015.

Refer to the SDAP Supporting Information: Public
passenger

transport infrastructure, Department of Transport and
Main

Roads, 2017, for further guidance on how to comply
with the

performance outcome.

No acceptable outcome is prescribed.

N/A — Refer above

 

PO22 Taxi facilities are located and designed to
provide convenient, safe and equitable access for

 

 

AOQ22.1 A taxi facility is provided parallel to the
kerb and adjacent to the main entrance.

N/A — Refer above

 

 

State Development Assessment Provisions — version 2.6
State code 6: Protection of state transport networks

Page 9 of 10

 

Page 10

  Performance outcomes                                    Acceptable outcomes                                     Response
  passengers.
                                                          AND
  Note: Refer to the SDAP Supporting Information:         AO22.2 Taxi facilities are designed in accordance       N/A – Refer above
  Public                                                  with:
  passenger transport infrastructure, Department of
  Transport and                                           1. AS2890.5–1993 Parking facilities – on-street
  Main Roads, 2017, for further guidance on how to           parking and AS1428.1–2009 Design for access
  comply with the                                            and mobility – general requirements for access –
  performance outcome.                                       new building work
                                                          2. AS1742.11–1999 Parking controls – manual of
                                                             uniform traffic control devices
                                                          3. AS/NZS 2890.6–2009 Parking facilities – offstreet
                                                             parking for people with disabilities
                                                          4. Disability standards for accessible public
                                                             transport 2002 made under section 31(1) of the
                                                             Disability Discrimination Act 1992
                                                          5. AS/NZS 1158.3.1 – Lighting for roads and public
                                                             spaces, Part 3.1: Pedestrian area (category P)
                                                             lighting – Performance and design requirements.
  PO23 Educational establishments are designed to         AO23.1 Educational establishments are designed          Not Applicable.
  ensure the safe and efficient operation of public       in accordance with the provisions of the Planning for
  passenger services and pedestrian access.               Safe Transport Infrastructure at Schools, Department
                                                          of Transport and Main Roads, 2011.
  Note: Refer to the SDAP Supporting Information:
  Public passenger transport infrastructure, Department
  of Transport and Main Roads, 2017, for further
  guidance on how to comply with the performance
  outcome.




State Development Assessment Provisions – version 2.6
State code 6: Protection of state transport networks                                                                                  Page 10 of 10


[OCR of page images]
Performance outcomes
passengers.

Note: Refer to the SDAP Supporting Information:

Public

passenger transport infrastructure, Department of
Transport and

Main Roads, 2017, for further guidance on how to
comply with the

performance outcome.

Acceptable outcomes

AND

| Response

 

AQ22.2 Taxi facilities are designed in accordance
with:

1. AS2890.5-1993 Parking facilities — on-street
parking and AS1428.1—2009 Design for access
and mobility — general requirements for access —
new building work

2. AS1742.11-1999 Parking controls — manual of
uniform traffic control devices

3. AS/NZS 2890.6-2009 Parking facilities — offstreet
parking for people with disabilities

4. Disability standards for accessible public
transport 2002 made under section 31(1) of the
Disability Discrimination Act 1992

5. AS/NZS 1158.3.1 — Lighting for roads and public
spaces, Part 3.1: Pedestrian area (category P)
lighting — Performance and design requirements.

N/A — Refer above

 

PO23 Educational establishments are designed to
ensure the safe and efficient operation of public
passenger services and pedestrian access.

Note: Refer to the SDAP Supporting Information:
Public passenger transport infrastructure, Department
of Transport and Main Roads, 2017, for further
guidance on how to comply with the performance
outcome.

 

 

AQ23.1 Educational establishments are designed

in accordance with the provisions of the Planning for
Safe Transport Infrastructure at Schools, Department
of Transport and Main Roads, 2011.

Not Applicable.

 

 

State Development Assessment Provisions — version 2.6
State code 6: Protection of state transport networks

Page 10 of 10

 

Page 11

State code 25: Development in South East Queensland koala
habitat areas
Table 25.2.1 All development
  Performance outcomes                                            Acceptable outcomes                                             Response
  Retaining koala habitat areas
  PO1 Development interfering with koala habitat (including       No acceptable outcome is prescribed.                            Complies with PO1 – The proposed development will have
  interfering with koala habitat as a result of material change                                                                   some impact on NJKHTs within the Core Koala Habitat
  of use and interfering with koala habitat as a result of                                                                        Area to the north of the development on the subject land;
  reconfiguring a lot) does not occur unless the application                                                                      however, the impact has been minimised as much as
  demonstrates the interfering with koala habitat has:                                                                            possible. The site is not designated a Koala Priority Area.
  1.   been reasonably avoided; or                                                                                                The impact upon the koala habitat on the site has been
  2.   been reasonably minimised where it cannot be                                                                               considered by Gondwana Ecology in the Terrestrial Ecology
       reasonably avoided; and                                                                                                    Assessment provided as Appendix B. The proposed
  3.   mitigated the impacts of the interfering with koala                                                                        development will result in the removal of 19 NJKHTs, for
       habitat values.                                                                                                            which an environmental offset is being provided.

  Koala sensitive design and connectivity
  PO2 The design and siting of development avoids                 No acceptable outcome is prescribed.                            Complies with PO2 – Given the nature of the remanent
  fragmenting koala habitat areas within the site.                                                                                vegetation on the site, which is limited to an isolated and
                                                                                                                                  disjointed pocket towards the north, the existing koala
                                                                                                                                  habitat will not be further fragmented by the development
                                                                                                                                  (refer Appendix B).

  PO3 The design and siting of development does not result        No acceptable outcome is prescribed.                            Complies with PO3 – The proposed development will not
  in impediments that restrict the movement of koalas by                                                                          impede or restrict the movement of koalas through the site.
  providing for safe koala movement between highly
  connected patches of retained koala habitat area.

  Koala safety from construction activities
  PO4 The construction of the development does not                AO4.1 A koala management plan is provided that includes:        Complies with PO4 – A small number of NJKHTs are to be
  increase the risk of injury or death of koalas.                                                                                 removed from within an isolated pocket of remanent
                                                                  1.   activities that may cause injury or death of koalas from   vegetation. It is not expected that the construction of the
                                                                       construction activities; and                               development will increase the risk of injury or death of
                                                                  2.   acceptable measures to avoid and mitigate injury or        koalas. A koala spotter could be used at the time of tree
                                                                       death of koalas from construction activities               removal, which could be conditioned.




State Development Assessment Provisions – version 2.6
State code 25: Development in South East Queensland koala habitat areas                                                                                              Page 1 of 2


[OCR of page images]
State code 25: Development in South East Queensland koala

habitat areas
Table 25.2.1 All development

eae Le mel el Coxe}
Retaining koala habitat areas

Acceptable outcomes

| Response

 

PO1 Development interfering with koala habitat (including
interfering with koala habitat as a result of material change
of use and interfering with koala habitat as a result of
reconfiguring a lot) does not occur unless the application
demonstrates the interfering with koala habitat has:

1. been reasonably avoided; or

2. been reasonably minimised where it cannot be
reasonably avoided; and

3. mitigated the impacts of the interfering with koala
habitat values.

No acceptable outcome is prescribed.

Complies with PO1 — The proposed development will have
some impact on NUKHTs within the Core Koala Habitat
Area to the north of the development on the subject land;
however, the impact has been minimised as much as
possible. The site is not designated a Koala Priority Area.

The impact upon the koala habitat on the site has been
considered by Gondwana Ecology in the Terrestrial Ecology
Assessment provided as Appendix B. The proposed
development will result in the removal of 19 NJUKHTs, for
which an environmental offset is being provided.

 

Koala sensitive design and connectivity

 

PO2 The design and siting of development avoids
fragmenting koala habitat areas within the site.

No acceptable outcome is prescribed.

Complies with PO2 — Given the nature of the remanent
vegetation on the site, which is limited to an isolated and
disjointed pocket towards the north, the existing koala
habitat will not be further fragmented by the development
(refer Appendix B).

 

PO3 The design and siting of development does not result
in impediments that restrict the movement of koalas by
providing for safe koala movement between highly
connected patches of retained koala habitat area.

No acceptable outcome is prescribed.

Complies with PO3 — The proposed development will not
impede or restrict the movement of koalas through the site.

 

Koala safety from construction activities

 

PO4 The construction of the development does not
increase the risk of injury or death of koalas.

 

 

AO4.1 A koala management plan is provided that includes:

1. activities that may cause injury or death of koalas from
construction activities; and

2. acceptable measures to avoid and mitigate injury or
death of koalas from construction activities

 

Complies with PO4 — A small number of NJKHTs are to be
removed from within an isolated pocket of remanent
vegetation. It is not expected that the construction of the
development will increase the risk of injury or death of
koalas. A koala spotter could be used at the time of tree
removal, which could be conditioned.

 

State Development Assessment Provisions — version 2.6

State code 25: Development in South East Queensland koala habitat areas

Page 1 of 2

 

Page 12

  Performance outcomes                                                             Acceptable outcomes                                                        Response
                                                                                   Note: To demonstrate compliance with this acceptable outcome, a koala
                                                                                   management plan must be prepared by a suitably qualified and experienced
                                                                                   person.

                                                                                   AND

                                                                                   AO4.2 Interfering with koala habitat complies with the
                                                                                   sequential clearing and koala spotter requirements under
                                                                                   section 10 and 11 of the Nature Conservation (Koala)
                                                                                   Conservation Plan 2017.
  Matters of State Environmental Significance
  PO5 Development:                                                                 No acceptable outcome is prescribed.                                       Complies with PO5 – The proposed development will result
                                                                                                                                                              in the removal of 19 NJKHTs from the site, for which an
  1.   avoids impacts on matters of state environmental                                                                                                       environmental offset is to be provided. The proposed
       significance; or                                                                                                                                       development will minimise and mitigate matters of state
  2.   minimises and mitigates impacts on matters of state                                                                                                    environmental significance which cannot be reasonably
       environmental significance after demonstrating                                                                                                         avoided (refer Appendix B). There are no other matters of
       avoidance is not reasonably possible; and                                                                                                              state environmental significance on the subject land.
  3.   provides an offset if, after demonstrating all reasonable
       avoidance, minimisation and mitigation measures are
       undertaken, the development results in an acceptable
       significant residual impact on a matter of state
       environmental significance that is a prescribed
       environmental matter.

  Note: Guidance for determining if development will have a significant residual
  impact on koala habitat areas is provided in Chapter 2A of the Queensland
  Environmental Offsets Policy.
  Guidance for determining if development will have a significant residual
  impact on all other matters of state environmental significance is provided in
  the Significant Residual Impact Guideline, Department of State Development,
  Infrastructure and Planning, 2014.

  Category C and R vegetation
  PO6 Development:                                                                 No acceptable outcome is prescribed.
  1.   avoids impacts on category C areas of vegetation and
       category R areas of vegetation; or
  2.   minimises and mitigates impacts on category C areas
       of vegetation and category R areas of vegetation after
       demonstrating avoidance is not reasonably possible.




State Development Assessment Provisions – version 2.6
State code 25: Development in South East Queensland koala habitat areas                                                                                                                       Page 2 of 2


[OCR of page images]
formance outcomes

 

Acceptable outcomes

Note: To demonstrate compliance with this acceptable outcome, a koala
management plan must be prepared by a suitably qualified and experienced
person.

AND

AO4.2 Interfering with koala habitat complies with the
sequential clearing and koala spotter requirements under
section 10 and 11 of the Nature Conservation (Koala)
Conservation Plan 2017.

 

 

Matters of State Environmental Significance

 

POS Development:

1. avoids impacts on matters of state environmental
significance; or

2. minimises and mitigates impacts on matters of state
environmental significance after demonstrating
avoidance is not reasonably possible; and

3. provides an offset if, after demonstrating all reasonable
avoidance, minimisation and mitigation measures are
undertaken, the development results in an acceptable
significant residual impact on a matter of state
environmental significance that is a prescribed
environmental matter.

Note: Guidance for determining if development will have a significant residual
impact on koala habitat areas is provided in Chapter 2A of the Queensland
Environmental Offsets Policy.

Guidance for determining if development will have a significant residual
impact on all other matters of state environmental significance is provided in
the Significant Residual Impact Guideline, Department of State Development,
Infrastructure and Planning, 2014.

No acceptable outcome is prescribed.

Complies with POS — The proposed development will result
in the removal of 19 NJKHTs from the site, for which an
environmental offset is to be provided. The proposed
development will minimise and mitigate matters of state
environmental significance which cannot be reasonably
avoided (refer Appendix B). There are no other matters of
state environmental significance on the subject land.

 

Category C and R vegetation

 

PO6 Development:

1. avoids impacts on category C areas of vegetation and
category R areas of vegetation; or

2. minimises and mitigates impacts on category C areas
of vegetation and category R areas of vegetation after
demonstrating avoidance is not reasonably possible.

 

 

No acceptable outcome is prescribed.

 

 

State Development Assessment Provisions — version 2.6

State code 25: Development in South East Queensland koala habitat areas

Page 2 of 2

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.