Original source · versioned page text
Attachment 2 - Bushfire and Essential Managment Clearing
Attached to the e-mail Applicant Response to SARA Advice Notice - 132005.638.04.
Essential
management Necessary
clearing set back clearing set back
from proposed for radiant heat
infrastructure - 1.5 flux 29kW/m2 -
times the tree ht - 12.4m from
24m proposed
infrastructure
24m
12.4m
New fence line
New fence line
Attchment 2B
USE FIGURED DIMENSIONS. ISSUE AMMENDMENT Title Exempt and necessary clearing -
FLEXURE Pty Ltd CLIENT
NOOSA COUNCIL DO NOT SCALE FROM THE
DRAWINGS. CONFIRM ALL
date details
proposed development
GRANT CALDER ARCHITECTURE AND URBAN DESIGN Date
DIMENSIONS ON SITE PRIOR 1 September 2025
TO CONSTRUCTION OR
FABRICATION. IT REMAINS Scale 1:500 @ A3
PROJECT RECYLE/TRANSFER STATION CENTRE THE CONTRACTORS
21 Bursaria Street Peregian Beach RESPONSIBILITY TO ENSURE Drawn Grant Calder
SP298776 561 Noosa Eumundi Road COMPLIANCE WITH ALL
ph: 0488 084 184
email - [email protected] PLANNING APPLICATION RELEVANT CODES AND
REGULATIONS IS Checked Grant Calder
Registered Architect- BOAQ 3112 MAINTAINED AT ALL TIMES.
Drawing No GC 147
135 MPAC 2 Issue - 0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original