Original source · versioned page text
2022-09-06 Planning & Environment Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2022 2 MCU21/0146 – REPRESENTATONS TO A DEVELOPMENT PERMIT FOR A MATERIAL CHANGE OF USE – MULTIPLE DWELLINGS (90 DWELLINGS) AT 28 EENIE CREEK ROAD, NOOSAVILLE Author Patrick Murphy, Coordinator Planning Environment and Sustainable Development Department Index ECM/ Application/ MCU21/0146 Attachments Nil APPLICATION DETAILS Applicant Stockwell Development Group Pty Ltd Development Approval Material Change of Use - Multiple dwelling Representations Received on 28 July 2022 Number of Submissions for 1 Original Application PROPERTY DETAILS Property Address Noosa Civic 28 Eenie Creek Rd Noosaville Qld 4566 RP Description Lot 3 SP 246584 Land Area 31.73 Hectares Future lots 17 – 19 = 10,109m2 Existing Use of Land Undeveloped portion of the Shire Business Centre STATUTORY DETAILS SEQRP Designation Urban Footprint Zone Major Centre Zone Environmental Management Zone Precinct High Density Residential Local Plan Code Noosaville Local Plan Area Overlays Land Subject to Acid Sulfate Soils - 5 metres AHD or below - Above 5 metres AHD to 20 metres AHD Biodiversity, Waterways and Wetlands Overlay Bushfire Hazard Overlay - High Potential Bushfire Hazard - Potential Impact Buffer Assessment Type Representations made to original approval EXECUTIVE SUMMARY The applicant makes representations to conditions regarding the use of the study rooms and performance bonds. The applicant maintains that the condition regarding the study is unlawful and that there is no planning purpose for the condition. It is not agreed that the condition is unlawful as it was imposed in accordance with the Sustainable Building Design Code, with the code included in the planning scheme after the scheme was reviewed and approved by the state. However, the amended unit layout and proposed windows and wall openings for the room are an improvement and reasonably comply with PO8 of the Sustainable Building Design Code. The representations also relate to the 2 performance bond conditions. It is agreed that the wording of one of the conditions could be improved by providing clarity on the timing of the bond’s release. Page 16 of 63
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.