Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2022-09-06 Planning & Environment Meeting Agenda

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                6 SEPTEMBER 2022


The applicant provided Probable Maximum Flooding (PMF) levels for the site prepared by
Hydrology & Water Management Consulting which indicates that flood immunity is potentially
possible for the future dwelling on the site with residents able to seek refuge in a PMF event within
future dwellings. Flood mapping for the PMF event is detailed in figures 4, below:




                      Figure 4 – Flood extent map – Probable Maximum Flood (PMF)

The Flood Hazard Overlay Code of the Noosa Plan 2020 includes the following outcomes for flood
management:




                                                                                     Page 27 of 63
Log in to download the original file

2022-09-06 Planning & Environment Meeting Agenda(PDF, 9MB).pdf · 9.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.