Original source · versioned page text
2022-09-06 Planning & Environment Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2022
The applicant provided Probable Maximum Flooding (PMF) levels for the site prepared by
Hydrology & Water Management Consulting which indicates that flood immunity is potentially
possible for the future dwelling on the site with residents able to seek refuge in a PMF event within
future dwellings. Flood mapping for the PMF event is detailed in figures 4, below:
Figure 4 – Flood extent map – Probable Maximum Flood (PMF)
The Flood Hazard Overlay Code of the Noosa Plan 2020 includes the following outcomes for flood
management:
Page 27 of 63
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.