GENERAL NOTES                                       ENVIRONMENTAL CONDITIONS
PRIOR TO COMMENCEMENT OF WORKS THE                  VEGETATION PROTECTION                               4. FILL MATERIAL                                      COMPACTION TEST RESULTS AND TEST LOCATIONS FOR
CONTRACTOR IS TO IDENTIFY AND BE SATISFIED OF THE                                                                                                             BASE COURSE TESTING SHALL BE SUBMITTED TO AND        WHERE NEW LANDSCAPING IS TO BE ESTABLISHED IN          ALL STORMWATER TO              HAVE   A   HEAVY   DUTY
                                                                                                                                                                                                                                                                                                                                   MAINTENANCE NOTES - DEFECTS
                                                    TREES LOCATED ALONG THE FOOTPATH SHOULD BE,         IMPORTED FILL MATERIAL SHALL BE APPROVED
CORRECT LOCATION OF ALL EXISTING SERVICES           WHERE   POSSIBLE    TRANSPLANTED     PRIOR TO       GRANULAR MATERIAL FREE OF VEGETABLE MATTER AND        APPROVED BY THE SUPERINTENDENT PRIOR TO PLACING      EXISTING PAVEMENT AREA, REMOVE A.C. SURFACE,           TRAFFICABLE LID U.N.O.                                   LIABILITY
WHETHER INDICATED OR NOT ON THE PLANS. ANY          CONSTRUCTION, OR REPLACED IF DESTROYED.             CONFORMING TO THE FOLLOWING:-                         SURFACE. SHOULD ANY TEST FAIL, THE CONTRACTOR        CONCRETE KERBS AND ROAD BASE TO A MINIMUM DEPTH
DAMAGE TO EXISTING SERVICES IS TO BE RECTIFIED AT                                                       AS SIEVE                       % PASSING              SHALL REWORK THE AREA AS REQUIRED OR AS DIRECTED     OF 300mm. INSTALL SUBSOIL DRAINAGE TO THE              ALL STORMWATER GULLY PITS SHALL BE LIP IN LINE, IN       SUCH MAINTENANCE SHALL BE CARRIED OUT IN
THE CONTRACTOR'S EXPENSE.                           WHEN WORKING WITHIN 4m OF TREES, RUBBER OR          75mm                           100                    TO OBTAIN THE SPECIFIED COMPACTION. BASE COURSE      PERIMETER OF THE NEW LANDSCAPE AREA AT A DEPTH                                                                  ACCORDANCE WITH THE PROVISIONS OF THE GENERAL
                                                                                                                                                                                                                   OF 300mm BELOW SUBGRADE LEVEL. FILL WITH TOP SOIL      ACCORDANCE WITH IPWEA STANDARD DRAWING DS-060
                                                    HARDWOOD GIRDLES SHOULD BE CONSTRUCTED WITH         4.75mm                         30 - 100               MATERIAL SHALL NOT BE PLACED UNTIL THE KERBS HAVE                                                                                                                    CONDITIONS OF CONTRACT WITH RESPECT TO MAKING
ANY WORK ON EXISTING SERVICES THAT REQUIRE                                                                                                                    ACHIEVED 20MPa STRENGTH.                             TO A DEPTH OF 100mm BELOW TOP OF KERB. REFER TO        TO DS-063 U.N.O.
                                                    1.8m BATTENS CLOSELY SPACED AND ARRANGED            0.075mm                        3 - 30                                                                                                                                                                                      GOOD DEFECTS AND OTHER FAULTS DUE TO FAULTY
RELOCATION BY AUTHORITIES SHALL BE CARRIED OUT BY   VERTICALLY FROM GROUND LEVEL. GIRDLES MUST BE       LIQUID LIMIT                   45% MAX.                                                                    ARCHITECTS AND / OR LANDSCAPE CONSULTANTS                                                                       REPAIR AND/OR WORKMANSHIP AND SHALL INCLUDE
THE RELEVANT AUTHORITY BUT WITHIN TERMS OF THE      STRAPPED TO TREES PRIOR TO CONSTRUCTION AND         PLASTICITY INDEX               15% MAX.               ALL PAVEMENT GRAVELS & TRENCHES SHALL BE BACK        DETAILS FOR FINAL PLANTING.                            ALL STORMWATER FIELD INLETS SHALL BE IN                  CLEANING UP AND REPAIR DUE TO STORM DAMAGE.
CONTRACT AND SHALL BE CO-ORDINATED BY THE           REMAIN UNTIL COMPLETION.                            CBR                            10% MIN.               FILLED IN LAYERS NOT EXCEEDING 150mm COMPACTED                                                              ACCORDANCE WITH IPWEA STANDARD DRAWING DS-050.
CONTRACTOR.                                                                                             LINEAR SHRINKAGE               8% MAX.                THICKNESS TO NOT LESS THAN:                          THE CONTRACTOR SHALL ARRANGE FOR A SURVEYOR TO                                                                  THE DEFECTS LIABILITY PERIOD SHALL BE FOR TWELVE
                                                    WHERE POSSIBLE, TREE ROOTS SHOULD BE TUNNELLED      TEST CERTIFICATES ON THE TEST FILL MATERIAL SHALL                                                          CARRY OUT 'WORKS AS CONSTRUCTED' SURVEY AND            THE CONTRACTOR SHALL BE RESPONSIBLE FOR                  MONTHS FROM THE DATE OF PRACTICAL COMPLETION
PRIOR TO COMMENCEMENT OF WORKS THE                                                                                                                            LOCATION          DENSITY     FREQUENCY              SUBMIT DETAILS SHOWN ON A PLAN TO THE HEAD
                                                    UNDER, RATHER THAN SEVERED. IF ROOTS ARE SEVERED    BE SUPPLIED TO THE DESIGN ENGINEER FOR APPROVAL                                                                                                                   LOCATING GULLY PITS IN RELATION TO THE NOMINAL           AND AS NOTED IN THE CONDITIONS OF CONTRACT
CONTRACTOR WILL PROVIDE SCOUR AND EROSION           THE DAMAGED AREA SHOULD BE TREATED WITH A           PRIOR TO THE USE OF THE FILL MATERIAL.                UNDER ROADS     95% SMDD      1 TEST PER 2 LAYERS    CONTRACTOR AND CIVIL ENGINEER AT COMPLETION OF         FACE OF KERB AND KERB AND CHANNEL.
PROTECTION INCLUDING PROVISION OF SEDIMENT TRAPS    SUITABLE FUNGICIDE. CONTACT COUNCIL ARBORIST FOR                                                          A) >500mm BELOW               PER 40m WITH AT        CONSTRUCTION. 'WORKS AS CONSTRUCTED' SURVEY IS
AND FENCES TO MINIMISE DEPOSITION OF MATERIAL       FURTHER ADVICE.                                     ALL FILL MATERIAL INCLUDING ROAD PAVEMENT U.N.O. IS   SUBGRADE                      LEAST 1 TEST IN 5      TO SHOW BUT NOT BE LIMITED TO LEVEL AND LOCATION       THE CONTRACTOR SHALL VERIFY THE INVERT LEVEL AT
ONTO DOWNSTREAM OF THE PROPERTY AS INDICATED                                                            TO BE PLACED IN LAYERS NOT EXCEEDING 150mm                                                                 OF NEW KERB, KERB AND CHANNEL, CONCRETE INVERT         THE CONNECTION WITH EXISTING STORMWATER PIPES
                                                                                                                                                                                            BEING ADJACENT TO
ON THE DRAWINGS.                                    ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN      COMPACTED THICKNESS AND COMPACTED TO THE              B) <300MM BELOW   98% SMDD                           AND KERB RAMP AND ANY DETAILS RELATED TO FINAL         PRIOR TO LAYING PIPES.
                                                                                                                                                                                            A MANHOLE OR           ROAD WORKS.
                                                    BY COUNCIL'S RECOMMENDED TREE SERVICES.             FOLLOWING DENSITIES:                                  SUBGRADE
THIS DRAWING SHALL BE READ IN CONJUNCTION WITH                                                                                                                                              GULLY                                                                         ALL TRENCHES SHALL BE BACK FILLED UNDER THE ROAD
ALL OTHER WORKING DRAWINGS, SPECIFICATIONS AND                                                                                                                C) PAVEMENT       95% MMDD
REPORTS AND WITH SUCH            OTHER WRITTEN      SOIL                                                 BUILDING AREA     100% MAXIMUM DRY DENSITY
                                                                                                                                                              ELSEWHERE         95% SMDD    1 TEST PER LAYER
                                                                                                                                                                                                                   STORMWATER DRAINAGE NOTES                              IN LAYERS NOT EXCEEDING 150mm COMPACTED
                                                                                                                                                                                                                                                                          THICKNESS NOT LESS THAN 100% MAXIMUM DRY DENSITY
INSTRUCTIONS AS MAY BE ISSUED DURING THE COURSE     TOPSOIL AND SUBSOIL SHOULD BE STOCKPILED                                    STANDARD COMPACTION                                                                                                                       STANDARD COMPACTION TEST (AS 1289).
                                                    SEPARATELY. CARE SHOULD BE TAKEN TO PREVENT                                                                                             PER 200m
OF CONSTRUCTION.        ALL DISCREPANCIES AND                                                            UNDER ROADS     95%     MAXIMUM DRY DENSITY                                                               ALL STORMWATER DRAINAGE PIPES Ø225 OR SMALLER
VARIATIONS SHALL BE REFERRED TO THE ENGINEER        SEDIMENT FROM ENTERING THE STORMWATER SYSTEM.                                                             SMDD - STANDARD MAXIMUM DRY DENSITY                  SHALL BE CLASS '2' RCP OR CLASS DWV uPVC UNLESS        TRENCH BACKFILL TESTING SHALL BE CARRIED OUT ON
                                                    THIS MAY INVOLVE PLACING APPROPRIATE SEDIMENT        A) >500mm BELOW         STANDARD COMPACTION
BEFORE PROCEEDING WITH THE WORK.                                                                                                                              MMDD - MODIFIED MAXIMUM DRY DENSITY                  APPROVED OTHERWISE.                                    EACH ALTERNATE COMPACTED LAYER AT A MAXIMUM 50m
                                                    CONTROLS AROUND STOCKPILES.                          SUBGRADE                                             (AS PER AS. 1289)                                                                                           CENTRES AND NO MORE THAN 3m FROM MANHOLE
ALL LEVELS ARE TO BE TO A.H.D LEVEL DATUM.                                                               B) <300MM BELOW   98%   MAXIMUM DRY DENSITY                                                               ALL STORM WATER PIPES Ø300 OR GREATER SHALL BE         STRUCTURE.
P.S.M. SURVEY ORIGIN IS PERMANENT BENCHMARK NO.     REHABILITATION                                       SUBGRADE                STANDARD COMPACTION          PAVEMENT MATERIALS SHALL BE COMPACTED AND            CLASS '2' RCP OR SN8 RIBBED POLY PIPE (E.G. BLACKMAX
PM142589 RL 58.174m. CONTACT STATEWIDE SURVEY       PRE-DISTURBANCE SOIL PROFILES AND COMPACTION                                                              MAINTAINED AT MOISTURE CONTENTS AT PLACEMENT         OR ENVIROPIPE ETC.) UNLESS APPROVED OTHERWISE.         THE CONTRACTOR IS TO ENSURE THE METHOD OF
GROUP Ph. 1300 362 094 FOR MORE INFORMATION.        LEVELS ARE TO BE REINSTATED.                                                                              WITHIN THE RANGE OF 2% WET TO 2% DRY OF STANDARD                                                            COMPACTION OF THE BACKFILL IS SUITABLE FOR THE
                                                                                                        REFER TO GEOTECHNICAL REPORT AND SPECIFIC CASE        OPTIMUM MOISTURE CONTENT U.N.O                       ALL STORMWATER DRAINAGE PIPE WITHIN COUNCIL OR
                                                                                                        FILL SHALL BE COMPACTED AND MAINTAINED AT                                                                                                                         CLASS OF PIPE INDICATED ON THE DRAWINGS.
                                                    PRE-DISTURBANCE VEGETATION PATTERNS SHOULD BE                                                                                                                  MAIN ROADS PROPERTY MUST BE RCP CLASS 2 OR 3 PIPE.
SOILS INVESTIGATIONS HAVE BEEN CARRIED OUT BY       RESTORED. FOR FURTHER INFORMATION CONTACT           MOISTURE CONTENTS AT PLACEMENT WITHIN THE RANGE       TRENCH BACKFILL TESTING SHALL BE CARRIED OUT ON                                                             IF NECESSARY THE CONTRACTOR IS TO ADJUST HIS
CORE CONSULTANTS, REFERENCE J002971-001-R-REV1,     COUNCIL ECOLOGICAL ASSESSMENT OFFICER.              OF 2.0% WET TO 2.0% DRY OF STANDARD OPTIMUM           EACH ALTERNATE COMPACTED LAYER AT MAXIMUM 50m        ALTERNATIVE PIPE TYPES/CLASSES MUST BE APPROVED        COMPACTION METHODS TO SUIT THE PIPE CLASS.
DATED OCTOBER 2025. THIS REPORT MUST BE READ IN                                                         MOISTURE CONTENT U.N.O. (REFER GEOTECHNICAL           CENTRES AND NO MORE THAN 3m FROM MANHOLE             BY THE DESIGN ENGINEER AND MAY REQUIRE DESIGN
ITS ENTIRETY PRIOR TO CONSTRUCTION BEING            CONTRACTOR TO HAVE CONTROLS ON SITE TO MANAGE       REPORT AND SPECIFIC CASE.)                            STRUCTURE.                                           CHANGES TO BE ACCEPTABLE (U.N.O.).                     WHERE THE TRENCH IS EXCAVATED IN WATERLOGGED
UNDERTAKEN.                                         DUST AT ALL TIMES, WHEN ANY AREAS OF THE SITE ARE                                                                                                              ADDITIONAL REQUIREMENTS FOR SPECIFIC PIPE TYPES        GROUND OR WHERE THE FOUNDATION IS CONSIDERED
                                                    EXPOSED.                                            5. GEOTECHNICAL INSPECTIONS AND TEST                  PAVEMENT MATERIAL CERTIFICATES AND GRADINGS ARE      AS FOLLOWS:                                            UNSUITABLE IN THE OPINION OF THE CERTIFYING
ALL WORK TO CONFORM TO THESE NOTES AND NOOSA                                                            CERTIFICATES                                          TO BE PROVIDED TO THE SUPERINTENDENT FOR                · ALL PIPES ARE TO BE INSTALLED AS PER THE          ENGINEER, A LAYER OF CRUSHED ROCK, 40mm TO 20mm
SHIRE COUNCIL STANDARDS AND SPECIFICATIONS          NOTE: ALL ENVIRONMENT PROTECTION MEASURES           COMPACTION TESTS. TO BE CARRIED OUT IN                APPROVAL PRIOR TO CONSTRUCTION.                            MANUFACTURERS SPECIFICATIONS.                    SIZE OR OTHER MATERIALS APPROVED BY THE
UNLESS OTHER WISE SHOWN ON PLANS OR DIRECTED BY     SHOULD BE IMPLEMENTED PRIOR TO ANY CONSTRUCTION     ACCORDANCE WITH AS 3798 (REFER TO GEOTECHNICAL                                                                · 'POLY' PIPES                                      INSPECTING ENGINEER SHALL BE LAID IN A 500mm THICK
THE PROJECT MANAGER.                                WORK, INCLUDING CLEARING, COMMENCING.               REPORT AND SPECIFIC CASE).                            PAVEMENT MATERIAL SHALL EXTEND 150mm BEHIND                ··       MINIMUM COVER 600mm UNDER               LAYER BELOW THE CULVERT BASE OR PIPE. THESE
                                                                                                                                                              KERB AND KERB AND CHANNEL.                                           ASPHALT                                AREAS ARE TO BE INSPECTED BY THE GEOTECHNICAL
SETOUT OF CARPARK BAYS AND AISLES BY ARCHITECT'S
U.N.O.
                                                    BULK EARTHWORKS NOTES                               'LEVEL 1' GEOTECHNICAL SUPERVISION AS DEFINED IN
                                                                                                                                                              WHERE NEW PAVEMENT JOINS EXISTING PAVEMENT THE
                                                                                                                                                                                                                         ··       MINIMUM COVER 600mm FROM                ENGINEER TO ASSESS WHETHER FURTHER EXCAVATION
                                                                                                                                                                                                                                                                          IS REQUIRED OR OTHER MEASURES CAN BE ADOPTED.
                                                                                                        SECTION 8 OF AS 3798 GUIDELINES OF EARTHWORKS FOR                                                                         UNDER-SIDE OF CONCRETE
                                                                                                        COMMERCIAL AND RESIDENTIAL DEVELOPMENTS, SHALL        EXISTING PAVEMENT IS TO BE SAW CUT AS INDICATED TO
                                                                                                                                                                                                                         ··        CCTV REQUIRED AT
ALL 'WORKS AS CONSTRUCTED' INFORMATION SHALL BE     1. GENERAL                                          BE PROVIDED UNDER ALL BUILDING AREAS AND ROADS.       PROVIDE A NEAT, STRAIGHT LINE.
                                                                                                                                                                                                                                  PRE-SEAL & PRE-POUR (HOLD POINT) &      THE CONTRACTOR SHALL ARRANGE FOR A SURVEYOR TO
SUPPLIED IN ELECTRONIC DATA FORMAT TO THE           EARTHWORKS SHALL BE CARRIED OUT IN ACCORDANCE                                                                                                                                                                         CARRY OUT A 'WORKS AS CONSTRUCTED' SURVEY TO
                                                                                                                                                              ALL FINISHED SURFACE LEVELS ARE SHOWN AT THE LIP                     AGAIN PRIOR TO PRACTICAL
RELEVANT AUTHORITIES REQUIREMENTS.                  WITH THE PROCEDURES SET DOWN IN AS 3798             THE CONTRACTOR SHALL BE RESPONSIBLE FOR                                                                                                                           SUBMIT DETAILS SHOWN ON PLAN TO THE HEAD
                                                                                                                                                              OF THE KERB AND CHANNEL OR THE NOMINAL FACE OF                      COMPLETION/HANDOVER (HOLD POINT)        CONTRACTOR AND DESIGN ENGINEER AT COMPLETION OF
                                                    GUIDELINES ON EARTHWORKS FOR COMMERCIAL AND         ORGANISING THE COMPACTION TESTS AND APPOINTING
DIMENSIONS SHALL NOT BE OBTAINED BY SCALING THE                                                         THE GEOTECHNICAL SUPERVISION UTILISING THE            THE KERB UNLESS NOTED OTHER WISE.                       · FRC PIPE                                          CONSTRUCTION. 'WORKS AS CONSTRUCTED' SURVEY IS
                                                    RESIDENTIAL DEVELOPMENTS.                                                                                                                                            ··       PIPE CLASS TO BE MINIMUM 3
DRAWINGS.                                                                                               ENGINEER WHO COMPLETED THE SITE INVESTIGATION IN                                                                                                                  TO SHOW BUT NOT BE LIMITED TO LEVEL AND LOCATION
                                                                                                        ACCORDANCE WITH AS 3798                               KERB AND KERB AND CHANNEL TO BE IN ACCORDANCE              ··       PIPE CLASS TO BE 'RCP CLASS             OF ALL DRAINAGE STRUCTURES, PIPES SIZES AND INVERT
'U.N.O.' STANDS FOR UNLESS NOTED OTHERWISE.         FILL BATTERS ARE TO BE OVER FILLED AND COMPACTED                                                          WITH IPWEA STANDARD DRAWING RS-080 AND TYPICAL                      NOMINATED' +1 [E.G. RCP(3) = FRC(4)]    LEVELS.
                                                    TO 1.0m BEYOND FINAL BATTER FACE THEN CUT BACK TO                                                         DETAILS PROVIDED ON DRAWING CP.2.01.                       ··       MINIMUM COVER TO BE 650mm
IN CASE OF DOUBT, ASK!
                                                    FINAL BATTER.                                       6. SERVICES                                                                                                                                                       PRIOR TO WORKS GOING ON MAINTENANCE OR A WORKS
                                                                                                        PRIOR TO THE COMMENCEMENT OF WORKS THE                KERB RAMPS ARE TO BE IN ACCORDANCE WITH NSC          NOTE: ALL COVER IS MEASURED TO THE OUTSIDE EDGE        COMPLETION   CERTIFICATE   IS   PROVIDED,  THE
                                                    SOFT SPOTS IN CLAY ARE TO BE DRAINED BY RUBBLE OR   CONTRACTOR IS TO IDENTIFY AND BE SATISFIED OF THE     STANDARD DRAWING NSD-9006E.                                                                                 CONTRACTOR SHALL ARRANGE FOR A CCTV TO BE
                                                                                                                                                                                                                   OF SOCKET JOINTS OR O.D. OF FLUSH JOINTED PIPE.
IMPORTANT SAFETY NOTICE                             AGRICULTURAL DRAINS TO PREVENT 'SUMPS' FORMING.     CORRECT LOCATIONS OF ALL EXISTING SERVICES
                                                                                                        WHETHER INDICATED OR NOT ON THE PLANS. ANY            WHERE COUNCIL STANDARD DOES NOT NOMINATE
                                                                                                                                                                                                                                                                          CARRIED OUT.
                                                                                                                                                                                                                   ALL STORMWATER PIPES 600Ø OR LESS SHALL BE
                                                    AT COMPLETION OF CONSTRUCTION THE CONTRACTOR        DAMAGE TO EXISTING SERVICES IS TO BE RECTIFIED AT     CONSTRUCTION METHODS OF CONCRETE KERB
MPN CONSULTING PTY LTD RECOGNISES THE                                                                                                                                                                              RUBBER RING JOINTED (RRJ). ALL STORMWATER PIPES
                                                    SHALL ARRANGE FOR A SURVEYOR TO CARRY OUT A         THE CONTRACTORS EXPENSE.                              SECTIONS TOOLED GROOVE JOINTS ARE TO BE PLACED       675Ø OR GREATER CAN BE FLUSH JOINTED.
IMPORTANCE OF OCCUPATIONAL HEALTH AND SAFETY.
HOWEVER, MPN CONSULTING PTY LTD HAS NOT BEEN
                                                    'WORKS AS CONSTRUCTED' SURVEY AND SUBMIT THE        THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SET       AT 3m MAXIMUM CENTRES. PLACE ADDITIONAL JOINTS TO                                                           PAVEMENT AND SIGNAGE NOTES                                                                        CONSULTANT: MPN CONSULTING PTY LTD
                                                    DETAILS SHOWN ON A PLAN TO THE HEAD CONTRACTOR      OUT OF ALL SERVICES & AUXILIARY ITEMS WITHIN THEIR    KERBS, MEDIANS, INVERTS IN THE SAME LOCATION AS                                                                                                                                                               CONTACT: TOBY TAWDE MUSPRATT
ENGAGED TO DEVELOP, CHECK, SUPERVISE OR CONTROL                                                                                                                                                                    ALL STORMWATER BEDDING SHALL BE IN ACCORDANCE
                                                    AND DESIGN ENGINEER.                                CORRECT ALLOCATION AREA.                              THE JOINTS IN THE CONCRETE PAVEMENTS WHERE                                                                                                                                                                    (RPEQ 24982)
WORKERS OR METHODS OF WORK.                                                                                                                                                                                        WITH IPWEA STANDARD DRAWING DS-030 (PIPES) OR          ALL PAVEMENT MARKING AND SIGNAGE TO BE IN
                                                                                                                                                              APPLICABLE.                                          DS-031 (CULVERTS).                                     ACCORDANCE WITH THE D.O.T. AND AS 1742 MANUAL FOR                                                 TELEPHONE: (07) 3335 4595
MPN CONSULTING PTY LTD DOES NOT HAVE THE
                                                    2. SOILS REPORT                                     ROADWORKS NOTES                                                                                                                                                   UNIFORM TRAFFIC CONTROL DEVICES.
                                                                                                                                                              SUBSOIL DRAINS SHALL BE MIN Ø100 CORRUGATED          5.0m SUBSOIL LEAD IN TO PITS AND MANHOLES IS                                                                                                                                             DATE 30/01/2026
CAPACITY OR AUTHORITY TO CONTROL WORKERS OR         SOILS INVESTIGATIONS HAVE BEEN CARRIED OUT BY
                                                                                                                                                              POLYETHYLENE PIPE TO AS 2439 AND CONSTRUCTED IN      REQUIRED IN ALL STORMWATER TRENCHES.                   FOR SIGNAGE AND ASSEMBLY DETAILS REFER TMR
METHODS OF WORK.                                    CORE CONSULTANTS, REFERENCE J002971-001-R-REV1,     FILL AND SUB GRADE SHALL BE COMPACTED AS DETAILED     ACCORDANCE WITH IPWEA STANDARD DRAWING RS-140.
                                                    DATED OCTOBER 2025. THESE REPORTS MUST BE READ IN   IN EARTHWORKS NOTES.                                                                                                                                              MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES.
                                                                                                                                                              TYPE 'C' SUBSOIL DRAINS ARE TO BE INSTALLED UNLESS   FILL BETWEEN MULTI CELL BOX CULVERTS TO BE DRY
NOTHING IN THESE DESIGNS SHOULD BE INTERPRETED      ITS ENTIRETY PRIOR TO CONSTRUCTION BEING                                                                  NOTED OTHERWISE OR AGREED WITH DESIGN ENGINEER.
AS GOING BEYOND THE STRUCTURAL INTEGRITY OF THE                                                         THE CONTRACTOR IS TO INITIALLY EXCAVATE THE                                                                LEAN MIX.                                              ALL SIGNS TO BE SIZE SIZE A.
                                                    UNDERTAKEN.
SUBJECT MATTER OF THE DESIGNS AND THEY SHOULD                                                           PAVEMENT TO LEVEL THEN ARRANGE 4 DAY SOAKED CBR       NOTE: ALL EXTERNAL SUBSOIL DRAINAGE LINES ARE TO
NOT BE USED AS AN INDICATOR OF THE APPROPRIATE                                                          TESTS ON THE SUBGRADE AND NOTIFY THE CIVIL                                                                 BITUTHENE TAPE TO BE USED ON BOX CULVERT JOINTS.       FOR ROADWORK DELINEATOR DETAILS REFER TMR
                                                                                                                                                              BE CONSTRUCTED IN ACCORDANCE WITH TMR STANDARD                                                              MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES.
METHODS OF WORK ON, IN OR AROUND THE SUBJECT                                                            ENGINEER.                                             DRAWING SD1116 U.N.O.
MATTER.                                             3. SITE PREPARATION                                                                                                                                            ALL DOWN PIPE CONNECTIONS SHALL BE PVC PIPE,
                                                                                                                                                              ALL SUBSOIL DRAINAGE OUTLETS ARE TO BE               RUBBER RING JOINTED CLASS DWV.                         EXISTING PAVEMENT MARKING ARE TO BE REMOVED BY
                                                                                                        ALL SUB GRADE AREA SHALL BE PROOF ROLLED AND          CONSTRUCTED IN ACCORDANCE WITH TMR STANDARD                                                                                                                                                           C       30.01.26 FOR APPROVAL                                            TTM     LS
CONCERNS ABOUT THE CONDUCT OF WORKERS OR            CLEAR THE SITE OF ALL DEBRIS INCLUDING EXISTING     COMPACTED TO MAXIMUM DRY DENSITY RATIO OF 100%                                                                                                                    GRINDING.
                                                                                                                                                              DRAWING SD1116.                                      DE-WATERING WHERE REQUIRED TO BE AT THE
METHODS OF WORK SHOULD BE RAISED WITH THE           BUILDING RUBBLE AND CONCRETE SLABS, TREES           STANDARD COMPACTION (AS 1289) WITH MOISTURE                                                                                                                                                                                                                 B       28.11.25 OPERATIONAL WORKS                                       TTM     LS
APPROPRIATE SAFETY OFFICIAL ON SITE.                EXCEPTING THOSE TO BE RETAINED, GRASS AND TOP       CONTENT WITHIN THE RANGE OF 2.0% WET TO 2.0% DRY                                                           CONTRACTORS COST.                                      LINE MARKING SHALL BE DULUX ROADMASTER WATER
                                                                                                                                                              WHERE SUBSOIL DRAINS ARE SHOWN CROSSING                                                                     BASED PAVEMENT MARKING OR APPROVED EQUIVALENT.                                            A       14.11.25 FOR COORDINATION                                        TTM     SR
                                                    SOIL TO A DEPTH OF 100mm MINIMUM AND ORGANIC        OF STANDARD OPTIMUM MOISTURE CONTENT. ANY SOFT        BENEATH TRAFFICABLE AREAS THE PIPES ARE TO BE
                                                    MATERIAL SUCH AS TREE ROOTS WHERE REQUIRED.         SPOTS ENCOUNTERED ARE TO BE EXCAVATED AND                                                                  ALL CONNECTIONS FROM DOWN PIPES TO MAIN DRAIN                                                                                                    ISSUE DATE                      AMENDMENT                                BY     APP
PEDESTRIAN SURFACES                                 STRIPPED TOP SOIL TO BE STOCKPILED ON SITE FOR      REPLACED WITH SELECT MATERIAL (MINIMUM CBR 15) AS
                                                                                                                                                              WATER TIGHT UPVC CLASS PN12.                         LINES SHALL BE MADE WITH MANUFACTURED FITTINGS                                                                                                   COPYRIGHT: THIS DESIGN AND PLANS ARE NOT TO BE USED OR REPRODUCED WHOLLY OR IN
                                                                                                                                                                                                                   UNLESS NOTED OTHERWISE.                                                                                                                                     PART WITHOUT WRITTEN PERMISSION OF MPN CONSULTING PTY LIMITED 2023 ©
                                                    REUSE IF REQUIRED OR REMOVED FROM SITE AS           DEFINED IN EARTHWORKS NOTES.                          SUBSOIL DRAIN CLEAN OUTS ARE TO CONSTRUCTED IN
ALL SURFACES SUBJECT TO PEDESTRIAN TRAFFIC SHALL                                                                                                              ACCORDANCE WITH IPWEA STANDARD DRAWING RS-142                                                                                                                                                                                                                        ABN: 39 062 191 799
                                                    DIRECTED BY STOCKWELL.                                                                                                                                         INVERT LEVELS SHOWN ON PLAN ARE AT PIPE /
MEET    THE    MINIMUM    PENDULUM    OR    RAMP                                                        ALL FILL MATERIAL EXCLUDING ROAD PAVEMENT IS TO BE    AND PLACED AT 80m MAXIMUM CENTRES.
RECOMMENDATIONS CONTAINED IN TABLE 3 OF                                                                 PLACED IN LAYERS NOT EXCEEDING 150mm COMPACTED                                                             STRUCTURE JUNCTION.                                                                                                                                                                                                P: 61 7 3335 4555
                                                                                                                                                                                                                                                                                                                                                                                                                                  E: [email protected]
AUSTRALIAN STANDARD HANDBOOK HB197:1999 - AN        PRIOR TO THE PLACEMENT OF ANY FILLING PROOF ROLL
                                                    THE SITE USING SIX PASSES OF A 10 TONNE MINIMUM     THICKNESS AND COMPACTED TO DENSITIES OUTLINED IN      ALL SAFETY SIGNS AND BARRICADES SHALL BE ERECTED
INTRODUCTORY GUIDE TO THE SLIP RESISTANCE OF                                                                                                                                                                       PIPE LENGTHS SHOWN ON PLAN / LONG SECTION ARE TO                                                                                                                                                                  Level 4, Building 3,
                                                    STATIC WEIGHT VIBRATORY PAD TYPE ROLLER.            THE EARTHWORKS NOTES.                                 TO COMPLY WITH TMR STANDARDS AND AS 1742.                                                                                                                                                                                                                         Kings Row Office Park,
PEDESTRIAN SURFACE MATERIALS. COMPLIANCE WITH                                                                                                                                                                      CENTRE OF STRUCTURE.                                                                                                                                                                          42 McDougall Street, Milton, QLD, 4064
THE RECOMMENDATIONS SHALL BE VERIFIED BY TESTING    SUBGRADE TO BE COMPACTED TO 100% MAXIMUM DRY
                                                    DENSITY STANDARD COMPACTION TO E1.1 AS1289.         ALL ROAD PAVEMENT MATERIAL IS TO BE PLACED IN         WHERE LANDSCAPING IS REMOVED IN NEW PAVEMENT
TO EITHER:- AS/NZS 4586:2004 - SLIP RESISTANCE                                                                                                                                                                     MINIMUM COVER TO RCP STORMWATER PIPES TO BE AS                                                                                                    CLIENT:
                                                                                                        LAYERS NOT EXCEEDING 150mm COMPACTED THICKNESS




                                                                                                                                                                                                                                                                                                                                             NOT FOR CONSTRUCTION
                                                    MOISTURE CONTENT OF THE SUBGRADE IS TO BE WITHIN                                                          AREAS EXCAVATE 500mm MINIMUM BELOW UNDERSIDE OF      FOLLOWS:
CLASSIFICATIONS OF NEW PEDESTRIAN SURFACE
                                                    THE RANGE OF 2.0% WET TO 2.0% DRY OF STANDARD       AND COMPACTED TO 95% MODIFIED MAXIMUM DRY             NEW PAVEMENT TO REMOVE ALL ROOT AND ORGANIC             · PIPES IN ROADWAYS - 600mm COVER
                                                                                                                                                                                                                                                                                                                                                                     STOCKWELL DEVELOPMENT GROUP PTY LTD
MATERIALS, OR AS/NZS 4663:2004 - SLIP RESISTANCE                                                        DENSITY.                                              MATERIAL FROM PAVEMENT AREA. COMPACT AREA TO A
MEASUREMENT OF EXISTING PEDESTRIAN SURFACES AS      OPTIMUM MOISTURE CONTENT.                                                                                                                                         · PIPES IN LANDSCAPE AREAS - 450mm COVER U.N.O.
APPROPRIATE IN BOTH INSTANCES COMPLIANCE SHALL
                                                                                                                                                              MAXIMUM DRY DENSITY OF 100% STANDARD                                                                                                                                                                   NOOSA EARLY LEARNING CENTRE
                                                                                                                                                              COMPACTION. FOLLOWING COMPACTION PLACE SELECT
BE DEMONSTRATED BY APPLYING CLAUSE 5.3 - MEANS OF   SOFT SPOTS AND / OR LOOSE AREAS WHICH DO NOT
                                                    IMPROVE WITH COMPACTION ARE TO BE EXCAVATED TO A                                                          FILL MATERIAL (MINIMUM CBR 15) IN LAYERS NOT
                                                                                                                                                                                                                   ALL STORMWATER MANHOLES SHALL BE CONSTRUCTED                                                                                                      LOT 4 NOOSA
DEMONSTRATING COMPLIANCE OF AS/NZS 4586:2004 -                                                                                                                                                                     IN ACCORDANCE WITH IPWEA STANDARD DRAWINGS
                                                    MINIMUM DEPTH OF 500mm AND REPLACED. THESE AREAS                                                          EXCEEDING 150mm COMPACTED THICKNESS TO THE                                                                                                                                                             63-65 HOFMANN DRIVE
SLIP RESISTANCE CLASSIFICATION OF NEW PEDESTRIAN                                                                                                              UNDER SIDE OF NEW PAVEMENT MATERIAL TO M.D.D.        DS-010, DS-015, DS-018, DS-019, DS-020 AND DS-021.
SURFACE MATERIALS.                                  ARE TO BE INSPECTED BY A GEOTECHNICAL ENGINEER                                                                                                                                                                                                                                                                   NOOSAVILLE, QLD 4566
                                                    TO ASSESS WHETHER FURTHER EXCAVATION IS                                                                   RATIO OF 100% STANDARD COMPACTION. (AS 1289).
IN GENERAL, THE CLASSIFICATION OF A SURFACING       REQUIRED OR IF OTHER MEASURES (SUCH AS
                                                    CONSTRUCTION OF A BRIDGING LAYER ) CAN BE
                                                                                                                                                                                                                                                                                                                                                                                    CONSTRUCTION NOTES
MATERIAL OR FINISH SHALL BE MADE ON A WORST CASE
BASIS AS DETERMINED BY PENDULUM TESTING USING       ADOPTED. SELECT REPLACEMENT MATERIAL TO BE                                                                                                                                                                                                                                                                                           SHEET 1
BOTH THE FOUR S AND TRL RUBBER SLIDER. WHERE        (MINIMUM CBR15) PLACED IN LAYERS NOT EXCEEDING
                                                    150mm COMPACTED THICKNESS, COMPACTED TO THE                                                                                                                                                                                                                                                                     DESIGN: TTM           DRAWN:     TTM             SCALES:       AS SHOWN
ADDITIONAL TEST RESULTS ARE AVAILABLE (OIL -WET
RAMP, WET/ BAREFOOT RAMP) THESE MAY BE TAKEN INTO   COMPACTION REQUIREMENTS.                                                                                                                                                                                                                                                                                        CHKD:      LS         APPRD:     TTM             DATE:         30.01.2026
CONSIDERATION.                                                                                                                                                                                                                                                                                                                                                           mpn JOB            DRAWING No.                                            REV


                                                                                                                                                                                                                                                                                                                                                                       9307 CN.0.02   C

                                                                                                                                                                                                                                                                                                                                                                         FOR APPROVAL

Log in to download the original (9307-OPW RFI 1 Civil Plans.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.