Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Attachment 4 - Engineering Report · MCU18/0015

of 59

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

               Flows up to and including the major Q100 storm event will be conveyed
               to and attenuated by the proposed attenuation tanks. Inspection of Excel
               screenshots (Appendix E) demonstrates that attenuation of stormwater
               runoff to pre-developed levels is achievable for all proposed sub-
               catchments.

               A total attenuation volume of 5kL will be required under covenant for
               each proposed townhouse/residential dwelling with a further 3kL of
               storage to be made available for indoor non-potable and outdoor
               irrigation reuse (8kL total) with low flow pipes sized to provide non-
               worsening of peak discharge volumes for a range of storm events.

               Please refer to the attached engineering drawings in Appendix C for
               locations and details of proposed attenuation measures.

       6.4     Stormwater Quality Management

       The site currently consists of 100% pervious land with significant tree/shrub
       cover. The proposed development will result in ≤ 25% of the site area becoming
       impervious, typically made up of roof and hardstand/road areas.

       For the purposes of stormwater quality management, the following design
       standards have been considered;

                      Table 3.4 – Desired Standard of Service – Stormwater Management
                       – Noosa Priority Infrastructure Plan
                      Table 14-61 – Water Sensitive Design Code – The Noosa Plan
                      Table 2 – Implementation Guideline No. 7 - South East Queensland
                       Regional Plan.

       The proposed development will result in ≤ 25% of the site being covered by
       impervious surfaces. In accordance with Item 3 – Table 2 – Design Objectives for
       Urban Stormwater Management – Implementation Guideline No. 7 - SEQ Regional
       Plan the development is exempt from pollutant load reduction targets provided;

              Stormwater from all impervious areas is captured and managed prior to
                discharge
              Management of captured stormwater includes reuse of stormwater and
                /or infiltration of stormwater to native soils.




______________________________________________________________________________
C5756/17/Engineering Report - 27 Attunga Heights, Noosa Heads          5
January 2017   JW/jl

Used in these records

About this file

File size
18.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 4 - Engineering Report.pdf · 18.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.