Council archive · source document
07/1173 - Operational Works - Transport Type 6 - Refurbishment of Boathouse & Jetty [As Published] · 142007.1173
INTEGRATED PLANNING ACT 1997 (IPA)
Part P, Version 1.1, 27 March 2006
Details of the application 8. Confirm, by ticking the applicable box(es), that the following details are provided in plans
A 9 9
Advice for completing Q8 supporting this application:
vaacwieere head be provided in jens {J (i) the location and dimensions of the proposed tidal works in relation to the tot/s abutting
may involve either of both plan view and the proposed works and the tidal land on which the works are proposed to be
elevation). constructed;
ae A te ra [XI (ii) all other structures on the water frontage and within 20 metres of the proposed works;
(eo store, gravel sand, rock ey. mud sitor KX (iii) the current location of Lowest Astronomical Tide (LAT), Highest Astronomical Tide
Soll) that is the property of the State. Refer to the (HAT), and Mean High Water Spring (MHWS);
EPA Guideline Allocation of quarry material on . . .
the EPA Website (C1 (iv) the slope angies of the beds and banks of the tidal area;
Advice for completing Q10 XI (v)_ the structural components of the proposed work;
f the works are proposed within a canal, the ‘ ‘, 5 5 :
EPA snot a concuence agency forthe works O (wi) the engineering design standards of the proposed works;
and the appicaion does rot fequire evidence of { (vii) the physical appearance of the structure including the materials used to construct the
resource entitlement at joes not require .
notifcation under the Native Til Act 1952. work and the proposed colour of the work;
Nota: “Abutting* means having a common C (viii) the engineering design specifications of the proposed works including references to the
boundary or edge; touching. relevant Australian Standards;
(1 (ix) the finished levels of the proposed works;
EI (x) details of the largest vessel to be moored at the structure;
(1 (xi). if dredging or excavation is required, the volume and type of material to be removed
and the disposal! area for the material being removed.
9. For works involving the removal of quarry material below high water mark, provide details of the
eC ig
resource allocation permit number: (ie. sand or gravel removed and placed above mean high water spring tide)
10. {s the application within a canal as defined in the Coastal Protection and Management Act 1995?
gt
NO
(Yes
Certification by a Registered 11. Have the design and safety provisions stated in the Prescribed Tidal Work Code contained in the
Professional Engineer Coastal Protection and Management Regulation 2003 been certified by a Registered
A Reglstered Professional Engineer of Professional Engineer of Queensland (RPEQ), or interstate equivalent?
Queensland (RPEQ), or the interstate equivalent
can certify that the proposed works comply with & NO
the design and safety provisions of tre (21 YES - provide the details below
Note: The provision of the certification may Name of RPEQ or equivalent (in full)
radia she eppicabie ape sation foe for the Contact mailing address
. assessment manager
regarding the applicable fea. Contact telephone/facsimile number
RPEQ No. or equivalent
This is to certify that each plan, lodged in support of this application, has been appropriately certified by
the above mentioned Registered Professional Engineer of Queensland (RPEQ), or interstate equivalent.
Portable Long Service Leave levy (if |12. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable) _
Prior to issuing a development permit for the w NO - Q13, 14.8 15 do not apply
works, the assessment manager is required by (1 YES - complete 013
law to ‘sigh?’ an approved form, issued by .
Qleave, which signifies that the PLSL levy under | 13. Has the PLSL levy been paid?
the Building and Construction Industry (Portable _ i i P
Long Service Leave) Act 1991 has been paid. oO NO - the applicable levy must be paid before a development permit can be given for the works
For further information refer to (11 YES - complete O14 & 15
httpywww.gleave.qid.gov.au 14. Amount paid:
15. Receipt number:
L_ |
PLEASE NOTE
PART P of this form cannot be accepted by the assessment manager unless accompanied by PART A of the form. The assessment manager may refuse
to accept an application that, at the time of lodgement, fails to provide all applicable information requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (appicabie to assessment manager)
DATE RECEIVED
COST CODE
(Applicable to EPA onty}
REFERENCE NUMBER/S
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1173 - Operational Works - Transport Type 6 - Refurbishment of Boathouse & Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.