Skip to the record
Search everything, all in one place.

Council archive · source document

Response to Further advice - 2023-01-11 RFI response · MCU22/0144

of 2

Text shows just the words. Original shows the document exactly as it was published.

            13th January 2023

            Ref:    MCU22/0144 OPW22/0207

            Ms N Gorton
            PO Box 141
            Tewantin, QLD 4565


            Attention:      Nadine Gorton

            Dear Ms Gorton,

                    Re:     Information Request
                    At:     9 Kauri St, Cooroy QLD, 4563

            With reference to the abovementioned development application and the subsequent
            information request from Council, we have prepared a response to the engineering matters
            raised as follows.

            Retaining Walls & Footings
               1. Provide additional comment by the designing engineering demonstrating that
                   the proposed Retaining Walls & Footings can be constructed wholly within the
                   subject site without adversely affecting the structural integrity of the
                   neighbouring properties (Lots 7 & 11 Kauri Street). The additional comment
                   must be certified by a suitably qualified person (RPEQ – Registered Professional
                   Engineer of Queensland).

            The proposed retaining wall, subsoil drainage and footings, including any temporary and
            permanent systems required during construction of the retaining wall are to be designed
            and certified by the geotechnical and structural RPEQ engineer as part of the detailed
            structural design. These systems – temporary and/or permanent – will be wholly contained
            within the subject site’s property boundaries and will not adversely affect the structural
            integrity neighbouring properties during installation (and/or removal, in the case of
            temporary systems) as is typical for constrained infill developments.


            Fall Prevention on Retaining Walls
                2. Provide additional detail demonstrating what fall prevention, if any, is
                   being proposed for atop of the proposed retaining walls.

            The driveway adjacent the southern retaining walls will be fitted with an integrated
            barrier kerb built into the driveway slab to prevent vehicles falling of the elevated
            driveway. A detail for the integrated kerb has been provided on drawing 51. In
            addition, the landscaping along the southern boundary will act as a further deterrent.

            The driveway drains to the central pits therefore drainage paths will not be impact
            along the southern boundary. To the east of the southern visitor parking, a 200mm
            gap in the barrier kerb will allow run-off from the driveway to drain to the bioretention
            garden for treatment.


P +61 7 5211 1003         A 75 Noosa Dr, Noosa Heads Qld 4567   E [email protected]      recorconsulting.com
Full text of the other 1 page

Page 2

            Vehicle Swept Paths
               3. Provide additional Vehicle Swept Path Plans that demonstrate a B99 vehicle is
                  capable of entering the above Visitor Bays and Unit Carparks in a forward gear,
                  exit the space in a reverse gear and exit the site in a forward gear in a total of
                  3 movements without entering proposed landscaped areas or colliding with
                  features of the development (i.e. retaining walls). The additional plans must be
                  prepared by a suitably qualified person (RPEQ – Registered Professional
                  Engineer of Queensland).

            The swept paths have been updated to ensure that the vehicle body does not pass
            over landscaping areas nor retaining walls. Please refer to plans C60, C61 and C62.

            Sustainable Building Design Code
               4. Provide updated plans which incorporate rainwater collection and reuse at the
                   site, sufficient to supply external non-potable fixtures such as communal
                   landscape irrigation and bin washdown. The rainwater tanks should collect
                   roofwater only (not surface runoff) and be located within communal open
                   space areas of the site.

            In accordance with the accepted outcome for the Sustainable Building Code, 3,000L
            of rainwater reuse storage has been provided as a below ground storage tank,
            nominally a Humes Rainvault RV3000-01-00 or equivalent. The maximum possible roof
            area is to be directed to the tank, with downpipes fitted with first flush capture devices
            to minimise pollutants being washed into the tank. The SWMP and design plans have
            been updated to reflect this addition.

            The rainwater reuse tank is to be plumbed to internal and external non-potable water
            fixtures including external irrigation fixtures, internal toilets and laundry areas, and is
            to be fitted with an automatic switching device to supply water when tank storage is
            exhausted. Design of the roof drainage system and reuse pump and supply is to be
            undertaken by the hydraulic consultant.

            For further details on the other items of the information request, please refer to the town
            planning response.

            We believe that the above satisfactorily addresses the engineering matters raised in the
            information request however, should additional information be required, please contact
            our office directly.

            Yours faithfully,
            RECOR Pty Ltd
            Prepared by


            Ben Parry
            Civil Engineer
            BEng (Hons), MIEAust CPEng NER
            RPEQ: 28084




P +61 7 5211 1003          A 75 Noosa Dr, Noosa Heads Qld 4567   E [email protected]       recorconsulting.com

Used in these records

About this file

File size
136 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Further advice - 2023-01-11 RFI response.pdf · 136 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.