Council archive · source document
07/2323 - MCU - Detached House [As Published] · 132007.2323
INTEGRATED PLANNING ACT 1997, IDAS Assessment Checktisl, Version 21.0, 3 September 2007
DECLARED FISH HABITAT AREA; WILD RIVER AREA
ts any of the proposed operational work to be carried out completely or party within a declared fish habltat area under the
Fisheries Act 1994
No
Yes
Hf yes, Indicate what the operational work is feasonable necessary for {Tick appicuble box’as)
© The maintenance of existing structures, Including for example tha following structures, ["} No (C0 Yes
if the etructures were constructed in compliance with all the requirements, under arty
Act, relating to @ structure of that type ~
« — Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming
enclosures and weirs;
Existing powerlines or associated powerline infrastructure
¢ — Educationel or research purposes relating to the fish hebitat area OONo [1] Yes
Monitoring the impact of development on the dectared fish habitat area Dono LYes
© — Other purposes Ono (C1 Yes
tyes to “other purposes”, Is that proposed operational work fo ba carried out in a wild river area declared under
the Wild Rivers Act 2005?
BQ No - (Compiate Par! O-) This application requires assessment by the Department of Primary Industries and Fishertes
(DPI8F), if OPIS is not the Assassinent Manager for the application, the agency will have jurisdiction as
Concurrence Agency.
O Yes
If yes, Is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
oO Yes — Unless the npplication is consistent with any property development plan applying to the land, the
Assessment Manager nust refuse to receive It. (Compiste Part Ox) This application requires assessment
by the Department of Primary industries and Fisheries {OPI8F) and assessment for the purposas of the
Wild Rivers Act 2005. If DPI&F is nol the Assessment Manager for {he appication, the agency has
jurisdiction as Concurrence Agency.
1 No
Itno, is any of the propased operational work to be carried out in a wild river high preservation area?
(1) —_No- Unless the application is consistent with any property development plan applying to the fand, the
Assessment Managor must refuse to receive il. (Compicte Part 0} This application requires
assessmont by the Department of Primary Industries and Fisheries (OPI&F) and, subject to the
declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2008,
11 DPIGF ie not the Assessment Manager for the appticetion, the agency Nes jurisdiction as
Concurrence Agency.
CO Yes - An application for ihe operational work wauld be taken to be’ net pronerly made and the assassmen
manager must ratuse to receive the epplicalion.
Me
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2323 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.