Skip to the record
Every meeting, every word.

Council archive · source document

07/2323 - MCU - Detached House [As Published] · 132007.2323

of 64

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

—~___. ‘ i

I

INTEGRATED PLANNING ACT 1097 IDAS Assaasment Checklist, Version 21.0, 3 September 2007
REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA
4.14. |is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
a No
CO) Yes
Ityes, indicate what the proposed operational work ts reasonably necessary for (Tick applicable boxes)
e The removal, destruction or damage of dead marine wood on unallocated Stete land, Ono OYes
other then in a wild river area, for trade or commerce
The meintenance of existing structures, including, for example, the following Tino [Yes
structures, if the structures were constructed In compliance with all the requirements,
under any Act, relating to a structure of thet type —
« boat ramps, boardwalks, drains, fences, jettles, toads, safety signs, swimming
enclosures and weire,
+ — existing drainage structures;
e@ +» — existing powerlines or associated powerline infrastructure ;
@ . For educational or research purposes or for the monitoring the impact of development Ono (Yes
on marine plants

 

 

© — Other purposes (No [Yes

Hfyes to “other purposes”, is that proposed operational work to. be carried out in a wild river area declared under
the Wild River Act 2005? :

(No - {Comptete Part O:} This application requires assessment by ihe Department of Primary industtas and Fitheries
(OPI&F). IF DPI&F is not the Assessment ‘Manager for the application, the agency has jurisdiction as Concurrence
Agency.
OO Yes
i yes, is afl of the proposed operational work for specified works under the Wild Rivers Act 2005?
(Yes — Untess the application is consistent wilh any property development plan applying to the land, {he
‘Assassinent Manager must ratuse to receive it. (Compioia Pari O;} This appiication requires assessment
by the Department of Primary industries and Fisheries (OPI&F) and, subject fo the declaration for the
relevant wikd river araa, assessment for the purposes ofthe Wild Rivers Act 2005. If OPIGF is not the
Agaessment Maneger for the pplication. the epency has jurisdiction as Concurrence Agency.
No
tino, is all of the proposed operational work necessary and unavoidable part of installing of
maintaining works or infrastructure required to support other development for which @ development
@ permitis not required of, 1a davelopment parmit is required, the permit is held or has been applied

for?

@ (1 Yes-Untess the application is consistent wilh axly, ‘proparty developnient pian applying to the land, the
Assessment Manager must refuse to receive i, (Complete Past C2) This application requires
assessment by tha Department of Pamary Industries and Fisherlas (DPI8F) and, subject fo the
declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2008.
If OPIGF is not the Assessment Menagar for the application, the aganty has jurisdiction as
Concurrence Agency.

& No - An application for the operations! work would de fakan fo be nat properly made and the Assessment
Manager musi refuse io receive I.

 

 

 

 

 

-4.

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2323 - MCU - Detached House [As Published].pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.