Original source · versioned page text
Attachment F - Natural Hazards Overlay Code - Flood
Attachment F – Natural Hazards and Natural Resources Overlay Code Development Permit for Material Change of Use Transport Type 2 Carpark situated at 4 - 8 and 16 Lower Mill Road, Cooroy and described as Lot 5 on SP213104 and Lot 7 on SP173771 Specific Outcomes and Probable Solutions for the Flood Hazard Table 13.10 Column 1 Column 2 Column 3 Specific Outcomes Probable Solutions (if code assessable) Compliance Hazardous materials O14 Development avoids the release of S14.1 Materials manufactured or stored on- Use does not involve the storage of any hazardous materials into floodwaters and the site are not hazardous or noxious, or hazardous materials on site. environment. comprise materials that may cause a detrimental effect on the environment if discharged in a flood event; or S14.2 Structures used for the manufacture or Not applicable storage of hazardous materials are— a) located above the defined flood level; or b) designed to prevent the intrusion of floodwaters . Essential network infrastructure O15 Essential network infrastructure (e.g. S15.1 Components of the essential network Proposed carparking not defined as electricity, water supply, sewerage and infrastructure that are likely to fail or may essential network infrastructure. telecommunications) maintains effective result in contamination when affected by function during and immediately after flood flood water— events. a) comply with Table 13.12; or b) are designed and constructed to exclude water inundation or infiltration and resist hydrostatic and hydrodynamic forces as a result of inundation O16 Community Uses and Infrastructure Uses S16.1 Community Uses and Infrastructure Carparking area will not be used in times are able to function effectively during and Uses are sited and constructed to ensure of flooding. immediately after flood events. that floor levels comply with flood immunity requirements specified in Table 13.12; OR Not essential community infrastructure. S16.2 Essential community infrastructure which is located below the specified flood immunity requirements— a) is designed and constructed to function effectively during and immediately after the recommended flood level flood event; and b) has an emergency rescue area above the probable maximum flood if it is for emergency services (including emergency shelters, police facilities, hospitals and associated facilities). Noosa Council Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment F - Natural Hazards Overlay Code - Flood.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.