NSC Plumbing Permit PL20.0261
subservient to all other related Development Conditions.)
Stages for inspection of permit work.
Section 65 of the Plumbing and Drainage Regulation 2019 requires that the local
government must inspect plumbing and drainage work that is permit work before the work
is covered.
This condition requires each of the following stages of Permit Work to be inspected.
(1) Plumbing and Drainage Regulation requires each of the following stages of
compliance assessable work be assessed before being covered. -
(a) For plumbing or drainage laid under a floor slab or in another area where pipes
or fittings will be covered-before the floor slab is laid or the pipes or fittings are
covered;
(b) For plumbing or drainage that is laid below ground level and external to a
building or other structure-before the backfill is placed;
(If the soil classification for the site is H,E or P - a design showing the
articulation of the sanitary drainage must be on site at the time of the
inspection).
(c) For plumbing installed in a building or other structure-before the cladding or
lining covering the plumbing is fixed;
(d) When the plumbing or drainage work, the subject of the request for compliance
assessment, is completed;
(2) The responsible person for the work must-
(a) Request an assessment of the work at each of the applicable stages mentioned
in subsection (1); and
(b) For the stage mentioned subsection (1) (d)-make the request within 5 days after
the work is completed; and
(c) Before or when the work is assessed, give the local government details in the
approved form (Form 7) of the responsible person.
(3) The responsible person may request an assessment of the work only if the
information or documents have been provided to the local government.
(4) For the purposes of this section, compliance assessable work is completed when
the work becomes operational.
As-Constructed drawings to be lodged with Council
The Applicant/Responsible person must supply in the approved form a As-constructed plan
for the sanitary drainage and below ground water supply, to Noosa Council Plumbing
Services.
As-Constructed drawings must be lodged with Noosa Council Plumbing Services
within 5 business days after the inspection/s of the service are complete.
Drawings must contain comprehensive detail of the works undertaken and be of a
professional standard on the Noosa Council As-constructed template, (these may be hard
copy format or electronic format).
Document Set ID: 21272842
Version: 1, Version Date: 21/10/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original