Skip to the record
Accept no imitations.

Original source · versioned page text

NSC Plumbing Permit PL20.0261

of 6

Page text shows just the words. Original shows the document exactly as it was published.

                  Pool Backwash & Stormwater Overflow
                  All pumped backwash discharge from sand and/or dematiaceous earth filter shall discharge
                  to the distributer retailers sewerage network through the sanitary house drain via
                  disconnector gully. All pools shall have stormwater overflow separately discharging into the
                  stormwater system to ensure compliance with Water Supply (Safety and Reliability) Act
                  2008 Section 193 Schedule 1.
                  Pool backwash must not discharge house hold waste water treatment facilities on
                  properties that are not in a sewerage reticulated area.
                  Reason for this condition: to ensure the effective operation of the sewerage treatment plant
                  stormwater shall be prevented from entering the service providers sewerage system.
                  Advised that this condition could also apply to 2 day approvals.

                  5.        REASONS FOR THE DECISION

                  To ensure all plumbing work is carried out as per the Plumbing and Drainage Regulation
                  2019.

                  6.        RELEVANT PERIOD OF APPROVAL

                  This Plumbing Compliance Permit has effect for a period of two (2) years from the decision
                  date 21 October 2020 and will therefore lapse 21 October 2022.
                  Should the work commence, the responsible person must ensure that all mandatory
                  inspections are undertaken by Council before 21 October 2022. This permit continues to
                  have effect and attaches to the land and binds the owner; the owner’s successors in title
                  and the occupier of the land.

                  7.        RESPONSIBLE PERSON

                  The responsible person for regulated work is a person licensed for the work and who
                  performs, directs the performance of, or supervises the work.
                  The responsible person must ensure the work performed complies with the Plumbing and
                  Drainage Regulation 2019.
                  The responsible person must submit their details to Council on the approved Form 7
                  (Notification of Responsible Person).
                  Inspections must be booked by a licensed person (Plumber/Drainer), please quote
                  application number PL20/0261 when booking inspections.
                  Inspections may be booked by calling: (07) 5329 6480, Noosa Council require 48 hours
                  notice when requesting an agreed time for plumbing inspections.

                  8.        ADVISORY NOTES

                  Infrastructure Charges
                  All developments and/or changes to existing developments may require payment of
                  Infrastructure Charges (as applicable) in accordance with Council’s Charges Resolution
                  made pursuant to the planning legislation and regulations current at the time of issue. If you
                  have any questions in relation to infrastructure charges please contact Council on 5329
                  6500 for further information.




Document Set ID: 21272842
Version: 1, Version Date: 21/10/2020
Log in to download the original file

NSC Plumbing Permit PL20.0261.pdf · 322 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.