Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2018-03-01 Special Meeting Agenda

of 22

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SPECIAL MEETING AGENDA   1 MARCH 2018


                                         Attachment 1




                         Page 15 of 22

Final Evaluation                                                                                     Attachment 1
                  NOOSA SHIRE COUNCIL             Weighted Attribute Evaluation Spreadsheet - Final Evaluation
                                                  Design and Construction of the Park Road Boardwalk
             a
                 NAME OF TENDERER                                        PRICE
                 (Conforming Tenders Only)                            (excl of GST)
             a |rutchinson Builders (ale)
           L3 Ark Construction Group Ptyitd(Ait)                        $7,518,381
              4
                                                                            1                 2                 3
                 [earacietans «YS [reinnaon [orm                                                                        |   mene
                                                                     Hutch      Td                         rk Constructlo   irk Constructlo
                                                                             Resultant                            Resultant
                                                                              score x                              score x
                                                                                tiny              zt              weightin,
              fowceornencmoy                   |       ame         | [ms | ms [ne [one [oom [ne | wm
                 CO BD
                em                                               |   tm | soo | mmo | soo | mo | soo | seo | seo |
              fomewey                            |  mam fo                         [owt oe |= [om |» [om
                 ewhcomenesssutiabaty          |       sx        | sas | aes | sus | as | sas | am | sos | oe |
              foriimencicemy                     |      =          | | a= | = | om | as | om | os | oe |
                 otal Tec   Soe                   re || __s__|___|
                              Normalised Technical Score (Tn)
[aac                                                ————«[                          [oieo        aon [erm                |  aeons |
                                                                     Hutchinson Bulld                     irk Constructl    irk Constructio
                  otal Fees (Pc)                        30%             $6,593,344       $7,092,243         $7,518,381        $8,992,143
                 Average Fees (Pav) $.....-ssssesesssseerseee $7,549,028
                 Price Score                                               113               106               100               81
                 Normalised Price Score (Pn)                               100               94                89                72
                 Weighted Price Score (Pw)                                30.00            28.24              26.74             21.54

                         Total Score of price and non price elements

                                                                                                                                   The Contract Administrator confirms the above scores
                     Contract Administrator & Assesment Panel Member 1                                                                     and weightings of this evaluation
                               Assesment Panel Member 2
                                                                                                                                        Contract Administrator's signature: |                 Project Manager (M8)
               |____          Assesment Panel Member4                           Health & Safety Rep (PR)
                                                                       Consulting Procurement & Contracts Adviser (AH)

             Copy of 1718T075 Evaluation Workbook_V6                                                                Page 1                                                                                             20/02/2018
                                                                                                                                    Page 15 of 22
Log in to download the original file

2018-03-01 Special Meeting Agenda(PDF, 3MB).pdf · 2.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.