Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2018-03-01 Special Meeting Agenda

of 22

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SPECIAL MEETING AGENDA                                                                     1 MARCH 2018


2                        1718T075 DESIGN    DEVELOPMENT       AND      CONSTRUCTION   OF   PARK    ROAD
                         BOARDWALK
DOCUMENT INFORM AT ION




Author                            Project Manager, Adam Britton
                                  Infrastructure Services Department

Index                             ECM\Projects\Noosa Heads Park Road Boardwalk Design-CAP.WORK
                                  500043
                                  ECM\Subject\Contracting\Tenders
                                  ECM\Subject\Contracts \ Projects

Attachments                       1.   Design Development and Construction of the Park Road
                                       BoardwalkTender Assessment
                                  2.   Design images



EXECUTIVE SUMMARY
This report provides a recommendation for the contract award of the preferred contractor for the
Design Development and Construction of the Park Road Boardwalk.

RECOMMENDATION
That Council note the report by the Project Manager to the Special Council Meeting dated 1
March 2018 and award tender 1718T075 for Design Development and Construction of the Park
Road Boardwalk to J Hutchinson Pty Ltd t/as Hutchinson Builders for the lump sum price of
$6,593,344.


REPORT
The proposed contract is for the design development and construction of approximately 420
metres of boardwalk to replace the existing section of the Park Road Boardwalk from Little Cove
to the Noosa National Park entrance. This section of boardwalk originally constructed in the mid-
1980s has reached the end of its useful life and requires replacement. It follows on from the
replacement of previous sections of boardwalk from Main Beach to Little Cove.

The contract works are proposed to commence onsite after Easter 2018 and be completed
ahead of the December 2018 holidays with a target completion of October 2018.

1.                       Design

The Park Road Boardwalk design for the section from Little Cove to Noosa National Park
entrance was originally developed through consultation with the Community Stakeholder Project
Reference Group. The aim of the project was to complete the link between Hastings Street and
the Noosa National Park and create an iconic project in keeping with the natural setting while at
the same time reducing the long term maintenance costs.

The resultant design has been developed to have minimal impact on existing vegetation, improve
accessibility, widen and provide opportunity to rest and take in views, as well as provide an
architectural design based on use of natural and durable materials in keeping with the Noosa
Design Principles. Refer Attachment 2 – Design images.




                                                                                              Page 9 of 22
Log in to download the original file

2018-03-01 Special Meeting Agenda(PDF, 3MB).pdf · 2.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.