Council archive · source document
Geotechnical Investigation · MCU24/0153
Text Figure 9: Footing depth required to prevent undermining Site drainage should be designed to readily remove surface water and to prevent ponding of water on subgrade areas during construction and also adjacent to foundations and perimeter slabs once construction is completed. It is recommended that footings be inspected by a suitably qualified and experienced engineer prior to placement of steel reinforcement and pouring of concrete to confirm allowable bearing pressures and cleanliness of excavations. If any soil conditions encountered during construction are found to differ from those noted in the geotechnical investigation, Tectonic should be notified immediately and an inspection carried out to determine if changes to footing design are required. 6.4 Temporary and Permanent Retention Excavations for the basement level may extend to depths of around 7 m BGL (existing ground levels) and the basement footprint will extend close to some of the site boundaries, so some form of temporary shoring will be required to support the basement excavation. Based upon our experience with similar sites, we anticipate that temporary shoring may be achieved by use of reinforced concrete contiguous pile wall. Sheet piling is not considered suitable for this site due to the depth of the excavation, the risk of consolidation of loose sands from vibratory effects and the potential for lateral movements to result in distress to existing structures or underground services behind the boundary walls. An alternative a secant pile wall configuration could be considered along with propping of the shoring wall with the use of internal struts. The temporary wall can also act as the permanent basement wall if appropriately designed. Installation of such piles in this setting would require the use of cast in place CFA piles. We understand that the client has been in consultation with a specialist contractor who has a small specialised rig that would be capable of installing such piles on this terrain. The advice of a specialist shoring contractor must be sought regarding feasibility, design and installation of the proposed retention and subsurface drainage system. It will be necessary to conduct numerical analysis to optimise the retention system. Proposed Unit Development 30 September 2024 | 24265-001-Rev0 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Geotechnical Investigation.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.