Delegated Report - Code - Planning OPW24 0180 · OPW24/0180

of 9

Text shows just the words. Original shows the document exactly as it was published.

               DURING CONSTRUCTION
                      Engineering
               12.    The integrity and condition of any existing public or Council infrastructure and services
                      (above ground and/or underground) must not be adversely affected by the proposed works
               13.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               14.    All works must be constructed, and work procedure undertaken in accordance with:
                      a.      the approved plans/documents and conditions detailed in this Decision Notice;
                      b.      all relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines;
                      c.      the latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.
                     Works within Road Reserves
               15.    No removal of street trees is permitted without Council’s prior written approval.
               16.    Safe pedestrian access on all streets in the vicinity of the development must be maintained
                      at all times. Should road closures be necessary to carry out construction works, Council’s
                      Engineering Officer must be notified prior to the proposed closure and all requirements
                      complied with.
               17.    All works must match neatly with existing road and verge features. Additional works beyond
                      the frontage may be required to provide an acceptable transition to existing road and verge
                      profiles.
                     Driveways
               18.    Driveway crossovers must be constructed generally in accordance Council’s Standard
                      Drawings RS-049 and RS-050.
               19.    Any existing unnecessary or redundant property accesses must be removed, and the kerb
                      and verge area reinstated to match the existing verge treatments. Grassed verge areas to
                      be reinstated must be provided with 100 mm topsoil and grass seed or turf and must be
                      maintained by the developer until established.
               20.    The following must be complied with during the construction of the required
                      crossover/driveway:
                      a.      the driveway surfacing must consist of either an approved hot mixed asphaltic concrete
                              or patterned/plain concrete;
                      b.      the driveway must be in accordance with the requirements of AS2890.1 Off-Street Car
                              Parking for longitudinal and crossfall gradients;
                      c.      the driveway must be constructed so as to not concentrate or direct stormwater runoff
                              onto neighbouring properties;
                      d.      have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset,
                              unless a written approval is obtained from Unitywater/Energex/Telstra and submitted
                              to Council;


                                                                                                          Page 6 of 9

Document Set ID: 23342778
Version: 3, Version Date: 15/11/2024
Log in to download the original file

Delegated Report - Code - Planning OPW24 0180.pdf · 2.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.