Council archive · source document
Delegated Report - Code - Planning OPW24 0180 · OPW24/0180
DURING CONSTRUCTION
Engineering
12. The integrity and condition of any existing public or Council infrastructure and services
(above ground and/or underground) must not be adversely affected by the proposed works
13. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
14. All works must be constructed, and work procedure undertaken in accordance with:
a. the approved plans/documents and conditions detailed in this Decision Notice;
b. all relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines;
c. the latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site.
Works within Road Reserves
15. No removal of street trees is permitted without Council’s prior written approval.
16. Safe pedestrian access on all streets in the vicinity of the development must be maintained
at all times. Should road closures be necessary to carry out construction works, Council’s
Engineering Officer must be notified prior to the proposed closure and all requirements
complied with.
17. All works must match neatly with existing road and verge features. Additional works beyond
the frontage may be required to provide an acceptable transition to existing road and verge
profiles.
Driveways
18. Driveway crossovers must be constructed generally in accordance Council’s Standard
Drawings RS-049 and RS-050.
19. Any existing unnecessary or redundant property accesses must be removed, and the kerb
and verge area reinstated to match the existing verge treatments. Grassed verge areas to
be reinstated must be provided with 100 mm topsoil and grass seed or turf and must be
maintained by the developer until established.
20. The following must be complied with during the construction of the required
crossover/driveway:
a. the driveway surfacing must consist of either an approved hot mixed asphaltic concrete
or patterned/plain concrete;
b. the driveway must be in accordance with the requirements of AS2890.1 Off-Street Car
Parking for longitudinal and crossfall gradients;
c. the driveway must be constructed so as to not concentrate or direct stormwater runoff
onto neighbouring properties;
d. have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset,
unless a written approval is obtained from Unitywater/Energex/Telstra and submitted
to Council;
Page 6 of 9
Document Set ID: 23342778
Version: 3, Version Date: 15/11/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.