ORDINARY MEETING MINUTES                                                    21 FEBRUARY 2019


        27.   The new path and frontage works must generally match the existing adjoining
              surfaces without causing a trip hazard and extend beyond the frontage where
              necessary to join and taper smoothly with any existing adjoining path and surfaces.
              Stormwater Drainage
        28.   The site must be provided with a stormwater drainage system connecting to a
              lawful point of discharge. The works must be undertaken in accordance with an
              Operational Works approval and the Queensland Urban Drainage Manual (QUDM)
              and the design be prepared and certified by a Registered Professional Civil
              Engineer, and must include/address in particular the following:
              28.1. Collection and discharge of stormwater to Council’s existing drainage system
                    in Kauri Street generally in accordance with Drawing No 2018068-P01 dated
                    12/09/2018 by 360 Civil Consulting and including the provision of any
                    required inter-allotment drainage within the site.
              28.2. Must be no net increase in the rate of stormwater runoff from the current
                    undeveloped condition of the site.
              28.3. Where applicable, extension of the site stormwater system to accommodate
                    stormwater from external adjoining properties, including registration of
                    drainage easements.
              28.4. The use of gravity stormwater drainage and not surcharge pits.
        29.   A CCTV inspection must be carried out by a Council approved CCTV contractor
              upon satisfactory completion of construction works. The developer will be
              responsible for the full cost of CCTV inspection, including any additional inspection
              necessary following defect identification and rectification.
              Easements
        30.   Unless otherwise agreed in writing by the relevant service provider, any public or
              third party infrastructure located on the subject site must be placed within an
              easement registered against the title of the property.
        31.   All easements must be designed in accordance with the planning scheme and
              granted at no cost to the Grantee. Where the Grantee is Council or a service
              authority, the easement documentation must be in accordance with the Grantee’s
              standard easement terms. Draft easement documentation must be submitted to
              Council for endorsement.
        32.   All works must be kept clear of any existing or proposed easements on the subject
              land, unless agreed otherwise in writing by the Grantee.
              Earthworks
        33.   All earthworks must be undertaken in accordance with a development permit for
              Operational Works and in compliance with the provisions of AS 3798: Guidelines
              on Earthworks for Commercial and Residential Development, with geotechnical
              testing undertaken in accordance with Section 8 of the Standard, and to a minimum
              of ‘Level 2’ supervision Test results as required by AS 3798 and/or the directions
              of the supervising engineer. A certification of the earthworks must be provided by
              a RPEQ and submitted to Council prior to the final inspection of the completed
              works by Council.
        34.   Earthworks works required on site must be carried out so as not to cause the
              additional ponding of water on any adjoining lands or the blockage of, or
              interference with, any natural watercourses.




                                                                                   Page 16 of 21
Log in to download the original file

2019-02-21 Ordinary Meeting Minutes(PDF, 429KB).pdf · 439 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.