2019-02-21 Ordinary Meeting Minutes

of 21

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING MINUTES                                                      21 FEBRUARY 2019


        35.   Earthworks carried out on site must not affect the structural integrity of any of the
              existing fences and/or structures and/or lands that border the development site.
              Fences that are affected must be replaced prior to the Building Certifier issuing the
              Certificate of Classification. In this regard any fences to be replaced must be clearly
              shown on the plans submitted for Operational Works approval.
        36.   All earthworks and any associated batters must be contained entirely within the
              subject site unless written permission from the respective landowner(s) is provided
              to Council.
        37.   Where the development involves changes to the existing levels over, or adjacent
              to, drainage, water supply or sewerage infrastructure, all access chamber surface
              levels must be adjusted to provide a freeboard of 100mm above the finished
              ground surface level or as required by the service provider and/or the approved
              plans for Operational Works.
        38.   All retaining walls and stormwater headwalls must be designed and constructed in
              accordance with the planning scheme and must be certified by an RPEQ where
              exceeding 1.0m in height. All retaining walls that are publicly accessible and
              exceed 1.0m in height must be fitted with a commercial grade safety fence.
              Erosion and Sediment Control
        39.   Any person acting on this permit must prevent erosion and sediment export from
              leaving the site. Site control measures such as silt fencing, controlled gravel access
              to the site and controlled disposal of waste, will be necessary.
              In this regard plans prepared by suitably qualified person detailing the methods
              and measures of controlling erosion and sediment are required to be submitted to
              the Council in conjunction with an application for the Development Permit for
              Operational Works.
              Water & Sewer Connections
        40.   An underground connection to reticulated water and sewerage must be provided
              to the development site in accordance with the standards and requirements of
              Northern SEQ Distributor–Retailer Authority (Unitywater).
        41.   A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
              (Unitywater) must be submitted to Council that certifies an underground connection
              to reticulated water and sewerage has been provided to the development site.
              Electricity and Telecommunication Services
        42.   Underground reticulated electricity and telecommunication services must be
              provided to the development site in accordance with an approval for Operational
              Works and be in compliance with the standards and requirements of the relevant
              service provider.
        43.   Unless otherwise stipulated by telecommunications legislation at the time of
              construction, the development must be provided with all necessary conduits, pits
              and pipes to accommodate the future connection of optic fibre technology
              telecommunications.
        44.   Certification must be submitted to Council from all relevant service providers which
              certifies that the development has met the requirements of this Decision Notice
              and all applicable legislation at the time of construction.
        45.   Conduits for electrical power or other services and connections proposed to be
              installed within existing and proposed road reserves under existing sealed
              carriageways, concrete pathways, concrete/sealed driveways or vegetation
              identified for retention must be installed by boring. Trenching is not permitted,
              unless specifically approved by Council.

                                                                                     Page 17 of 21
Log in to download the original file

2019-02-21 Ordinary Meeting Minutes(PDF, 429KB).pdf · 439 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.