Original source · versioned page text
2022-06-16 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 16 JUNE 2022
f. all retaining walls and structures are fully contained within the lot they retain any
fill, including fill batters, are wholly contained within the subject site and not on
adjacent properties.
External Works
48. The table drains in the verge areas in the frontage of the subject site to Glenridge Drive
must be reconstructed to be free draining. The works must be undertaken in accordance
with an Operational Works approval and must include in particular:
a. The frontage of proposed Lot 8 must be completed prior to the sealing of the survey
plan for Stage 1.
b. The remainder of the frontage, including the proposed intersection, must be
completed prior to the sealing of the survey plan for Stage 2. The intersection must
be constructed generally in accordance with drawing No. 21598-P002, Revision D
prepared by TOD engineers.
Condition 48 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
49. A new intersection must be constructed joining Glenridge Drive with the new road. The
works must be undertaken in accordance with an Operational Works approval and be
completed prior to the sealing of the survey plan for Stage 2. The intersection must be
constructed generally in accordance with drawing No. 21598-P002, Revision C prepared
by TOD engineers, the Engineering Report Document No. 21598_RP1, Revision B
prepared by TOD engineers dated 24 March 2022 and must include in particular:
a. an intersection with vehicle priority maintained on Glenridge Drive
b. provision of sight distances adequate for the design speed of the road
c. truncation of the new property boundaries
Condition 49 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
New Roads
50. The new road as shown on the Approved Plans must be constructed and dedicated as
“road”. The works must be undertaken in accordance with an Operational Works
approval and be completed prior to the sealing of the survey plan for Stage 2. The works
must include in particular:
a. a reserve width of 20 metres with widening at the cul-de-sac head and generally in
accordance with the approved plan
b. a cross section generally in accordance with drawing No. 21598-P002, Revision C
prepared by TOD engineers
c. a cul-de-sac head generally in accordance with drawing No. 21598-P002, Revision
C prepared by TOD engineers and Council’s Planning Scheme Policy 6 –
Engineering Design Standards
d. table drains and culvert drainage generally in accordance with drawing No. 21598-
P002, Revision C prepared by TOD engineers and the approved flood investigation
Condition 50 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Property Access and Driveways
51. A residential driveway must be constructed to all lots in the relevant stage. The works
must be undertaken in accordance with an Operational Works approval and:
a. be generally in accordance with drawing No. 21598-P002, Revision C prepared by
TOD engineers and
Page 23 of 43
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.