Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

09/0986 - Preliminary Building Approval [As Published] · 172009.986

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkiist, Version 22

  
 
 

Form 1 Development Application

— IDAS |
Assessment Checklist

 
  

IDAS Development Application Form 1 is the approved form for all development applications under the Integrated
Planning Act 1997 IPA). Form 4 is made up of various Parts. ;

&
4 Part A (Common details) of Form 1 must be completed for all applications, The relevance of other Parts of Form
4 depends on the nature of the application. - ta

Form 1 also includes this IDAS Assessment Checklist, which is used to assist in determining State assessment and ..
referral requirements, and the Parts of Form 1 relevant to the application.

Section 1 and all other relevant sections of the IDAS Assessment Checklist, as identified in the Table below, must
‘be completed for all development applications except those proposed on land in an urban development area, or for
building work requiring assessment against the Building Act 1975 only.

For more information about development applications on land in an urban development area, refer to
www.ulda.qld.gov.au.
For more advice about building applications refer to Part B of the IDAS Application Form,

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If
unsure, phone or visit your local government or log onto the DIP website www.dip.ald.gov.au for help

 

For all 1DAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 4 of this
checklist

Does the application seek approval to make a material change of use of the premises? C1 Yes Lato
if yes - complete Section 2 of this checklist.

 

 

Does the application seek approval to reconfigure a lot? O Yes | fio

if yas - complete Section 3 of this checklist and Part F of IDAS Application Form 1. ff the premises are completely within a single local
government area assessment is by the focal government.

 

Does the application seek approval to carry out operational work? C1 Yes ANo
if yes - complete Section 4 of this checklist.
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Ces | (flo
if yas - complete Section 5 of this checklist.

 

 

 

Have you received a referral agency response under section 3.3.2.0f the IPA, in relation to this development (D7 Yes j LeHvo
application? :

if yes - complete Section 6 of this checklist.

Does the application seek approval to carry out building work requiring assessment against a local government (Aves (No

planning scheme?
ifyes - complete Form 1 Part E of DAS Application Form 1, Assessment is by the focal government.
Does the application seek approval to carry out building work requiring assessment against the Buliding Act 1975? - [Aves CINo

ityes - go fo Appendix 1 of this checklist for advice on building referrals. Complete Part B of DAS Application Farm 1. Assessmentis by a
building certifier.

 

 

 

Do you wish the application to be assessed against a superseded planning scheme? (Yes (ao
ityes - complate Form 1 Attachment 1. .
ts the application for development completely or partly on Cais or Mackay airport land under the Airport Assets UC Yes [ANio

(Restructuring and Disposal) Act 2008?

ifyes-Assessment is by the Department of Infrastructure and Planning. Complete Form 1 Part D of IDAS Application Form 1 if the application
is for a material change of use, and Part E if for building or operational work. Also, the application must be referred to the focal government as
Advice Agency. :

 

 

 

 

 

Page 1

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0986 - Preliminary Building Approval [As Published].pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.