Skip to the record
Beware of cheap imitations.

Council archive · source document

09/0986 - Preliminary Building Approval [As Published] · 172009.986

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

   

 

 

 

    

Part E, Version 3.2

 

 

of the work er ae AE | ;
1. Naty 2 work that requires assessment agai
/ Building work - Complete TableA -.-.. [] Operational work - Complete Table &
‘|Table A ws . :

(i) What is the nature of the building work made assessable in the planning scheme?

 

(ii) Are there any current approvals associated with this application? (e.g. material change of use)

TERN Vananon (cq uren acca pore pec:
(ANN on

 

         

‘* List of approval referencels Date approved |

CINo __. 7] Yes - Provide details below One 2eFpecr wv

“Bate: approval tapses (i known)

 

 

 

 

 

 

 

 

Table B ns ‘ : ‘ yo te . oS
(i) What is the nature of the operational work made assessable in the planning scheme? = **

CI Roadworks (Stormwater (J Water infrastructure [[] Clearing vegetation un
LC Drainage works [) Earthworks C Sewerage infrastructure
7] Landscaping (1 Signage {J Other - Specify

[21 Development Permit ©" [1 Both (Specify below)

[.

(iv) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?

 **“F*] Preliminary Approval

der the planning scheme

 

(iii) What type of approval is being sought? (NOTE: Ifyou have indicated multiple operational works in question (i) above and your answers fo this question
would be different for different operational work, it may be more appropriate fo provide these details in an attachment to this form)

 

ma) Cl Yes - Specify the number of lots being created

 

 

 

‘L1No (1 Yes - Conipiete Tabie Ba)

(v) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring a lot)

 

Table Bia) | al caList of approval references

 

Date approved ......'

}Date approval lapses. (if known)

 

1.

 

 

 

 

 

 

 

 

 

 
   

 

 

nsancreaneannnesecariaqenit ery
i Mandatory’ informatio
Lema aig ot, ew PAs to: eine

 

 

 
 

 

3. Confirm the following mandatory information accompanies this application

 

Confirmiaticn of lodgement|: Method of lodgement

 

» + |Plans;'ahd spécificati

 

 

te] Confirmed

 

 

 

extent of any cut and fly .

In RxE0N

 

OFFICE USE ONLY

 

 

 

 

 

 

 

 

completing Part E

 

| General advice -
« — Part Amust also be completed for all IDAS development applications.

* The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question,

 

 

Qi L ‘A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur.

 

 

1 This form Is also used for building or operational work assessable against the tand use plan for Caims airport land or Mackay. airport land. Wherever

~ planning scheme is mentioned, take it to mean the tand use plan for the airport land.
Page 1

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0986 - Preliminary Building Approval [As Published].pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.