Appendix D- Engineering Assessment
Earthworks Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: Sept 2020
Performance Outcomes Acceptable Outcomes Solution1 Comments Council Use
Effects of Works
Drainage AO1 RO1
PO1 Filled or excavated areas have a minimum Bulk earthworks will be designed to
Finished surface levels ensure land is gradient of 0.5% and drain to Council’s prevent ponding on site and on
free draining stormwater infrastructure where available, neighbouring land. All stormwater
or where stormwater infrastructure is not surface runoff and subsoil flows will
available, toward the street be directed to the lawful point of
discharge. Refer NSC Water
Quality and Drainage Code.
Hydraulics No acceptable outcome provided. RO2
PO2 The existing drainage
Change to the levels on site do not have characteristics of the site and
an adverse impact on the flooding and surrounding area has been
drainage characteristics off-site. considered. The proposal ensures
that surrounding properties and
downstream stormwater
infrastructure and waterways are
not adversely impacted by the
proposed development.
Geotechnical considerations AO3.1 RO3.1
PO3 Filling works are undertaken in accordance All filling will be undertaken in
Earthworks do not result in geotechnical with Council’s Planning Scheme Policy accordance with Council’s PSP6 –
instability on-site or to nearby premises. PSP6 Engineering design standards - Engineering Design Standards –
roads, drainage and earthworks. Roads and Drainage & Earthworks.
All excavation will be undertaken
with no adverse impact on
neighbouring properties or
surrounding infrastructure.
AO3.2 RO3.2
Where the filling is for residential, The proposal complies. Refer to
commercial or industrial purposes the RO3.1
works comply with Australian Standard -
Guidelines for earthworks on commercial
1
Solution: Acceptable Solution Page 1 of 5
A/S Alternative Solution D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\ESA\Working\Appendices\NSC Earthworks Code 2020.docx
N/A Not applicable to this proposal Job: 23098
Rev: 0
Site Address: 5 Pearl Street, Cooroy 22/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.