Appendix D- Engineering Assessment
Earthworks Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: Sept 2020
Performance Outcomes Acceptable Outcomes Solution1 Comments Council Use
(b) the earthworks including cut and fill N/A
batters and retaining walls are setback
a minimum of 20 metres from the
property boundary; and
(c) the dam work involves less than
500m³ of material.
AO12.3
For all other zones— N/A
No acceptable outcome provided.
1
Solution: Acceptable Solution Page 5 of 5
A/S Alternative Solution D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\ESA\Working\Appendices\NSC Earthworks Code 2020.docx
N/A Not applicable to this proposal Job: 23098
Rev: 0
Site Address: 5 Pearl Street, Cooroy 22/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.