Appendix D- Engineering Assessment
Earthworks Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: Sept 2020
Performance Outcomes Acceptable Outcomes Solution1 Comments Council Use
excavation or filling is minimal.
Infrastructure protection No acceptable outcome provided. RO10
PO10 Prior to construction the contractor
Earthworks and vehicular access do not will confirm the correct locations of
adversely impact on the capacity,
operations and maintenance of existing
all existing services whether
indicated or not on the plans. The
infrastructure construction of the proposed
development will ensure the
protection of all existing services or
public utilities.
Environmental protection No acceptable outcome provided. RO11
PO11 An Erosion and Sediment Control
Earthworks minimise any adverse impact Plan shall be prepared (prior to
upon groundwater, watercourses, commencement of construction)
drainage lines, wetlands, and native and maintained for the
vegetation management of the sediment laden
stormwater runoff during the
construction phase in accordance
with Council’s PSP6 – Engineering
Design Standards – Roads and
Drainage & Earthworks.
Dams AO12.1
PO12 Where the site is in the Rural zone—
Dam location and construction does not (a) the land has a slope of less than 25% N/A
impact upon neighbouring properties or (1:4);
road reserves, in terms of— (b) the earthworks including cut and fill
(a) hydrology; batters and retaining walls are setback
(b) alteration of existing overland flow a minimum of 50 metres from the
paths and patterns; property boundary; and
(c) landslide or failure of dam wall; and (c) the size of the lot is greater than 5
(d) effluent disposal areas hectares.
AO12.2
Where the site is in the Rural residential
zone or the Rural zone and the lot is less
than 5 hectares:
(a) the land has a slope of less than 1:6;
1
Solution: Acceptable Solution Page 4 of 5
A/S Alternative Solution D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\ESA\Working\Appendices\NSC Earthworks Code 2020.docx
N/A Not applicable to this proposal Job: 23098
Rev: 0
Site Address: 5 Pearl Street, Cooroy 22/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.