Original source · versioned page text
Appendix D- Engineering Assessment
Paper size A3 Map has been designed to be reproduced in colour All underground cables shall be treated as being energised. Where a cable is located that is not represented on the ENERGEX BYDA map, then ENERGEX shall be contacted immediately. For Emergency Situations please call 13 19 62 SOGOU: i ee P90167-A } I RY energex ree BYDA Sequence: 225352172 Date: 01/06/2023 Scale: 1:500 Tile No: 2 | For a full list of Map Se | en Sar | Symbols, please refer to the supplied i ee BYDA Symbology Legend page AS5488 Category “D” Plan N s DISCLAIMER: While reasonable measures have been taken to ensure the accuracy of the information contained in this plan response, neither Energex nor PelicanCorp shall have any liability whatsoever in relation to any loss, damage, cost or expense arising from the use of this plan response or the information contained in it or the i completeness or accuracy of such — information. Use of such information is This output provides details of the ENERGEX electrical network. As variations map exist no responsibility is incurred by ENERGEX for the accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site subject to and constitutes acceptance of these terms. Plans generated 01/06/2023 by Pelicancorp TicketAccess Software | www.pelicancorp.com Energex - Response Plan.docx (13 Mar 2023)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.