Appendix D- Engineering Assessment
Paper size A3 Map has been designed to be reproduced in colour
All underground cables shall be treated as being energised. Where a cable is located that is
not represented on the ENERGEX BYDA map, then ENERGEX shall be contacted immediately.
For Emergency Situations
please call 13 19 62
Ios
P2066758
P768367-A
X768368
P30$733
P7694-C
+C
SOC8 31 ¥
RIF
energex
BYDA
Sequence: 225352172
Date: 01/06/2023
Scale: 1:500
Tile No: 3
For a full list of Map
Symbols, please
refer to the supplied
BYDA Symbology
Legend page
AS5488 Category “D” Plan
N
s
DISCLAIMER: While reasonable
measures have been taken to ensure the
accuracy of the information contained in
this plan response, neither Energex nor
PelicanCorp shall have any liability
whatsoever in relation to any loss,
damage, cost or expense arising from
the use of this plan response or the
information contained in it or the
completeness or accuracy of such
information. Use of such information is
This output provides details of the ENERGEX electrical network. As variations map exist no responsibility is incurred by ENERGEX for the
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.
subject to and constitutes acceptance of
these terms.
Plans generated 01/06/2023 by Pelicancorp TicketAccess Software | www.pelicancorp.com
Energex - Response Plan.docx (13 Mar 2023)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.