Skip to the record
Every meeting, every word.

Original source · versioned page text

10. APP E. Traffic Impact Assessment Report

Attached to the e-mail MCU14/0102 Development application Part 2 of 4 App E Traffic Report, App F Landscape Plan.

of 115

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 19, section 1. The text section number identifies this passage in the reader.

 

PEKOL TRAFFIC & TRANSPORT

The largest vehicle type expected to service the tyre and mechanical use is a refuse collection vehicle
(RCV). Service vehicles would be able to stand along the western side of the building, adjacent to the fuel

court.

3.6 Active and Public Transport

3.6.1 Pedestrians and Cyclists

A pedestrian connection is proposed from the existing footpath on Eumundi Road to the service station
and restaurant / café tenancy. The proposed development layout encourages low vehicle speeds and

prioritises pedestrian movements around the site.

3.6.2 Public Transport

The proposed development will not have a negative impact on the existing and proposed public transport

services and facilities.

P:\2014-15\15-067 LIONEL DONOVAN DRIVE, NOOSAVILLE\REPORTS\139 EUMUNDI ROAD, NOOSAVILLE TIA REPORT.DOCX 15
Log in to download the original file

10. APP E. Traffic Impact Assessment Report.pdf · 6.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.