Concurrence Agency Response (DTMR) - OPW13/0163

of 3

Text shows just the words. Original shows the document exactly as it was published.

)>




                                              ec:-s   ll54
                                          IBOX~13’&)R:.......e........I~
     ~,!!~iOOOOE (@                                                        Queensland
                                                                           Government




                                                                           File
                                                                                  no:215/01760
                                                                                  P20068-
                                                                                  MOMP20524-
                                                                                  MOM




     C/c      Attn: Denis Shaw
              Sunshine Coast Regional Council
              Locked Bag 72
              Sunshine Coast Mail Centre Old 4560




              For your information.



                 et!~
            rc;ptain Richard C Johnson
              Regional Harbour Master (Brisbane)

              21 March 2013




     Department of Transport and Main Roads
Full text of the other 2 pages

Page 2

J




                                                                                          Queensland
                                                                                          Government


     Our ref          215/01760 P20068-MOM P20524-MOM
                                                                                           Department of
     Your ref
                      Geoff Prendergast
                                                                                           Transport and Main Roads
     Enquiries



    21 March 2013
                                                                                                                       ;.....
                                                                                                              ’i....     "



    Pile it Pty Ltd
    Noosa Jetty Builders                                                                                                        "’1-
                                                                                                                                 ;:
    PO Box 299                                                                            ’i.


    Noosaville Qld 4566                                                                   ~JJ~.ef.r ~~i:J :~. t
                                                                                           ...
                                                                                                 ’: \ ’" (_ I I’ j’~            .’    ’




                                                                                           .
                                                                                                     ~


                                                                                                                         .~ ,,r
                                                                                                 .


                                                                                                         ;,;_; ’1
    Dear Sir/Madam
                                                                                            i f r,~::,(;t r} ~74J .~~



    Tidal Works         -

                         Request for comments
    Jetty       - T. Wilson, 16 Mossman Court, Noosa Heads (Lot 156 N.218.59)


    Thank you for your letter 1 March 2013 about your proposal to construct a jetty at-the

    location mentioned above.


    As a concurrence agency, Maritime Safety Queensland has no objection to the proposal

    provided the following navigation and marine safety conditions are complied with.

                                                                                                         ._


                                                                                                               ~’,’~ ",          ~        .....




    1.         The contractor must build the jetty according to John Norden and Associat s, Dr wing’
               No: 13/20-1A, attached to your letter dated 1 March 2013.


    2.         No part of the structure or any ship berthed at this structure is to come closer than 1.5
               metres from the side boundaries of the allocated water space as shown on the
               submitted water allocation plan.


    3..        The jetty and all freestanding piles must be lit and clearly visible to approaching vessels.
               The contractor must position all lighting so it does not cause a risk to the safe navigation
          ..
               of other vessels.


    4. The applicant or his agent is responsible for the removal of any existing structure above

           or below the     waterline, and must contain and remove any debris. Any pile that needs to
           be removed must be totally extracted.


    5.         Thef ship moored at this pontoon must follow the most direct course from this structure
               to open waters and a similar direct course when returning to this pontoon.


    6.         The owner is to ensure that the ship berthed at this structure must maintain sufficient
               under keel clearance at all stages of tide. The ship must comply with any local
               restrictions placed on channel depths and draft restrictions.

Page 3

.
    .1




          7.     Any ships and equipment you or your agent use must comply with the Transport
                 Operations (Marine Safety) Act 1994, the Transport Operations (Marine Safety)
                 Regulation 2004 and the Transport Operations (Marine Pollution) Act 1995.

          8.     Any ships using this structure must comply with the Transport Operations (Marine
                 Safety) Act 1994 and the Transport Operations (Marine Safety) Regulation 2004.

          9.     Any ship moored at this jetty must not impede the safe navigation of other ships or
                 restrict safe access to or from neighbouring structures.


           10. Any ship berthed, moored or attached to the jetty must not exceed the following sizes:


                     Wet Berth                                          Dry Berth
                 Length Overall   -
                                      5   metres                           N/A

                 Beam   -
                                      2   metres


           11. The contractor must construct the jetty within two years from the date of approval. If
                 construction is not completed, you will need additional or amended comments from the

                 Regional Harbour Master.

          Maritime Safety Queensland does not need to be further consulted if all of the above
          conditions are met.


          The above conditions must be included in your application to the assessment manager.


          This agency will also forward a copy of this letter to the Assessment Manager.




          Yours sincerely




             oJ~
         "ff""

          Captain Richard C Johnson
          Regional Harbour Master (Brisbane)




                                                                                                  Page 2 of 2

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Concurrence Agency Response (DTMR) - OPW13_0163.pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.