Council archive · source document
Approved Plans MCU11/0168 & OPW11/257
Plans and drawings: the text below has words only, no drawings.
SUNSHINE COAST REGIONAL COUNCIL
APPROVED
OPW 11/0257 27 Sep 2011
[OCR of page images]
From Harvesting Tonk
#150 OVERFLOW
From OP's {~T I {
HARVESTING TANK RETENTION AND PEAK FLOW
5,000 UTRE MITIGATION. TANK
VOLUME 5,000 LITRE.
: , : SS Ground
PON NRO EIN I IRENE PEPPER EIEN ENE PNA RS NAR ESAS ERAS EN, ESAS
AND
RAINWATER HARVESTING
MITIGATION TANK SETUP.
SCALE: NIS
DRIVEWAY ~—\
SESE ay
He
#150 OVERFLOW.
FROM TANK. \
Q
OOO
TOLL
200 WIDE GRATED DRAIN.
[surcrasce TO ROAD SURFACE.
IOTE:
DEPTH OF PIPE AND DEPTH OF
CONCRETE ORAIN CHANNEL SHALL BE
DETERMINED DURING CONSTRUCTION.
300X300 RUSBLE UNDER DRAIN
WRAPPED §N GEO TEXTILE.
GRATED DRAIN SECTION
#50 SLOW LEAK
SUNSHINE COAST REGIONAL COUNCIL
APPROVED
OPW 11/0257 27 Sep 2011
7 Spe Y PROJECT: YO amd
Construction 7
Hydraulic 3 TAPLEY RESIDENCE :
contact: Reinhold Koenning McAust RPEQ No 7023 0 _.- we i
PO Box. 181 Ee AHSCA MARCUS DUNES ESTATE oe .
Moffat Beach, Qld, 4551 . re oo A__ RESPONSE TO RFI 121-09-11,
Pi: 8491 4333 FX: 5491 4233 CLIENT: yy Issue Notes Date
ARCHITECT : TAPLEY For Development ApprovaliX - 25-08-11
FOSTER DESIGNS Design’ 22.2 incawn | FFP date (28-08-11 | Deg. No. i For Building Approval
DRAWING TITLE: scale : NTS onasuno.: 40f 5 2508-4 A For Tender. Sacntiad -
For_ Construction
DETAILS RPD:— LOT 34 SP 111721 L fs Constructed
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
APPROVED PLANS MCU11/0168 & OPW11/257Related documentApplication case desk ↗
APPROVED PLANS MCU11/0168 & OPW11/257Related documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.