p
RUNOFF & DETENTION CALCULATIONS:
MAXIMUM EVENT: Q100
TIME OF CONCENTRATION: Smin 3 12
INTENSITY: 326mm/or
SITE AREA: 557sqm g
IMPERVIOUS. AREA: 275sqm 8
a
PRE DEVELOPMENT PEAK RUNOFF: 44L/s a
PEAK RUNOFF POST DEVELOPMENT: 47L/s =
é
DETENTION VOLUME REQUIRED: 3,680 LTRE
DETENTION VOLUME PROVIDED: 5,000 UTRE
REDUCTION REQUIRED: 3L/s
o 2 4 6
REDUCTION PROMDED: 10L/s
TOTAL PROPOSED TANK VOLUMES:
TANK FOR HARVESTING:
TANK FOR RETENTION:
5,000 LITRE
5,000 LITRE
STORMWATER HYDROGRAPH THROUGH TANK
——-— NO RETENTION
WITH RETENTION
10 12 14 16 18 20
TIME (MINS.)
SUNSHINE COAST REGIONAL COUNCIL
APPROVED
OPW 11/0257 27 Sep 2011
EY Construction FORT
. Hydraulic 2
contact: Reinhold Koenning micaust RPEQ No 7023
PO Box 181 a \
Maffat Geach, Qld, 4551 HSCA
TAPLEY RESIDENCE
LOT 34
MARCUS DUNES ESTATE
PH: 5491 4333 FX: 5491 4233 CLIENT:
ARCHITECT : “| TAPLEY
FOSTER DESIGNS _ [Design RH Orawn | RF. date 25-08-11 | Dug. No.
DRAWING TITLE: sexe: NTS onasuno,. Sof 5 2508-5
A
L. CALCULATIONS A RPD:— LOT 34 SP 111721
KA ‘As Constructed
oe Pte]
A = RESPONSE TO RFI
Issue -
For Development Approval’ X
For Building Approval _-
For Tender _
For Construction _
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
APPROVED PLANS MCU11/0168 & OPW11/257Related documentApplication case desk ↗
APPROVED PLANS MCU11/0168 & OPW11/257Related documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.