Log in to see the plans as drawn20 March 2020 Our ref: 195 Weyba Road SMP File ref: 7465 [email protected] Noosa District Body Corporate Management Suite 9 41 Sunshine Beach Road Noosa Heads QLD 4567 Attention: Andrew Davidson Dear Andrew 195 WEYBA ROAD DEVELOPMENT STORMWATER MANAGEMENT PLAN Executive Summary This letter presents the stormwater management plan for the development at 195 Weyba Road. As part of the development there is a slight increase in roof area which results in an almost negligible amount of additional runoff. Black & More were informed that there is a requirement to maintain a maximum of 25L/sec out of each kerb adaptor, although the design event was not specified. Council planning scheme was also consulted for further requirements, specifically “PSP05 – Engineering Design Standards – Roads, Drainage and Earthworks”. It is proposed to install two kerb adaptors and evenly split roof water flows between them. Also, it is proposed to install a surface drainage pit in the covered car park, which will mainly address maintenance flows (i.e. flows from hose) but will also provide relief if flooding were to occur. The open areas will will maintain existing ground levels and grades. Any landscaping work will maintain a 1% grade toward the street and promote sheet flow. Please refer to the attached roof plan mark-up which detailed the proposed stormwater drainage measures. Please note the location of downpipes and underground pipes shown is indicative only and is to be confirmed with the architect. The location of the kerb adaptors, however, shall be 1m offset from the lot boundaries, as per Noosa Council’s design standards. Roof flows shall be split between the kerb outlets. These proposed measures will provide an overall improvement to the stormwater drainage of the site. Please do not hesitate to contact our office should you wish to discuss this further. Yours sincerely BLACK & MORE Peter Mathers Principal Civil Engineer Encl: Proposed Stormwater Mark-up www.blackm.com 7/28 Sunshine Beach Rd BRISBANE | CAIRNS | SUNSHINE COAST | TOOWOOMBA ABN: 19 609 960 232 PO Box 611 Ph: 07 5447 4444 Noosa Heads QLD 4567
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 7 pages
Page 2
Introduction
Noosa District Body Corporate Management, via Andrew Bock Architecture, engaged Black & More to prepare a Stormwater
Management Plan (SMP) for the development at 195 Weyba Road, Noosaville. The SMP is required to meet Noosa Council’s
development application requirements.
An architectural drawing set containing existing building plans and proposed development plans was provided to Black & More.
This SMP assess pre and post development roof water flows and informs the designers of required stormwater controls to meet
Noosa Council’s Planning requirements.
Existing Conditions
Black & More undertook a site inspection to gain an appreciation of the stormwater drainage infrastructure of the site and the
surrounding area.
There are two independent structures on the site; a low set blockwork shop frontage and a high set structure which partially
covers the low set structure. It is believed that these structures were constructed at different times, although their history is
unknown. A car parking area is also present beneath the highset structure.
Surrounding Drainage Infrastructure
The surrounding streets have kerb and channel which
flow to underground drainage lines, which outlet to the
adjacent tributary. There is a highpoint at the corner of
Weyba Road and Swan Street.
This indicates kerb flows to the south along Swan Street
and to the west along Weyba Road. These kerb flows
are collected by drainage pits.
See Figure 1 which shows the underground stormwater
drains in green and the assumed highpoint.
It is intended to discharge roof water to the kerb and the
minor overland flows will sheet flow to the kerb.
Figure 1 - Adjacent Drainage Infrastructure
(Source: Noosa Council Interactive Mapping)
195 Weyba Road SMP
2
Page 3
Existing Roof Water Drainage
As can be seen in Figure 2 & 3, roof water from the highset structure is collected in downpipes which are then directed beneath
the highset structure and above the lowset structure to the carparking area (see Figures 5 & 6).
The roof water from the low set structure also falls to this area. This roof area could not be inspected; however, it is reasonable
to assume the roof water it collected into the same downpipes eventually. The downpipes then travel below ground and outlet
to the kerb on Swan Street. This was the only roof water outlet point observed.
Figure 2 – Roof Plan Mark-up of Roof Water Flows
Figure 3 - Ground Floor Mark-up of Existing Roof Water Drainage
195 Weyba Road SMP
3
Page 4
Figure 4 - Downpipe flows Directed Between Structures to Car Park
Figure 5 - Downpipes in Car Park
Figure 6 - Location of Roof Water Kerb Outlet
195 Weyba Road SMP
4
Page 5
Allotment Overland Drainage
There is insignificant ground surface surrounding the building and it generally falls toward the street. There are no defined
surface drainage channels and it is considered storm water sheet flows toward the street in these locations.
The car parking area surface was severely damage and had many low spots. A severely clogged PVC pipe was found in the
carparking surface, see photo below. It could reasonably be assumed that this was once a surface water drainage pit/pipe for
this carpark. It is also likely that this pipe is connected to the roof water pipe which outlets to the kerb. Although this detail is
unknown.
195 Weyba Road SMP
5
Page 6
Stormwater Assessment
The following design criteria have been adopted after consultation with the Noosa Planning Scheme (PSP05). Please note the
below are only highlighted for relevance to this project, the entire Noosa Plan must be complied with, to the satisfaction of Noosa
Council.
- For each allotment, two PVC kerb and channel adaptors to be installed in the kerb 1m away from both side boundaries
(section 4.15)
- Design Recurrence Interval of 1 in 10 year for Commercial Development (Section 4.6a). Although a higher immunity will be
provided.
- Allotments shall have a minimum grade of 1% (Section 4.9)
- Maximum of 25L/s out of each kerb adaptor (as advised by Client/Council’s Officer)
It is proposed to discharge all roof water flows via downpipes to the kerb.
The carparking area should be repaved and re-surfaced. It is proposed to install a surface drainage pit in this carpark, which will
connect to the kerb adaptor also.
It is unlikely any stormwater will enter the carpark area. However, this pit will provide a means to drain water from other sources
(i.e. from cleaning with hose).
It is also possible, in a major event, that stormwater may enter the car parking area from flooding of the adjacent ground. For
this reason, we have considered the exterior catchment of the property adjacent the carpark which may contribute to stormwater
flows as impervious, this is a conservative approach.
The pre-development impervious area is approximately 375m2. The development increases this impervious area by
approximately 50m2 (or 13%). The increase in runoff due to this increase is not appreciable and by splitting flows between kerb
outlets will result in an overall improvement of stormwater drainage.
Figure 7 - Existing Roof Catchments
Figure 8 – Roof Catchments for Post Development Scenario
195 Weyba Road SMP
6
Page 7
Proposed Stormwater Design
Roof Water Drainage
The architectural drawings show the lowset block structure being demolished and an extension to the highset structure in its place.
This would mean the existing downpipe arrangement would need to be demolished, including existing below ground pipes and
kerb adaptors. This will allow for new guttering and downpipes to be installed.
Please refer to the attached mark-up for the proposed drainage scheme.
- The catchment in blue to be directed to a kerb adaptor on Weyba Road
- The catchment in red to be direction to a kerb adaptor on Swan Street (including connection of the pit from the car parking
area.
This proposed scenario will result in:
- Q100 = 15L/s out of kerb adaptor 1
- Q100 = 23L/s out of kerb adaptor 2
Note these values are for the 1 in 100-year event, therefore are well within limits.
Also, it was assumed that a new guttering and downpipe arrangement was possible due to the extension. Locations of downpipes
have not been considered and are to be confirmed with the architect. The aim of the stormwater arrangements is to split roof
water flows between the 2 kerb adaptors, relatively evenly.
Overland Flow
The existing ground levels provide for adequate surface drainage and will not change. Proposed landscaping works will maintain
the exiting surface drainage outcome, i.e. the development will maintain minimum 1% surface grades to the street(s) to promote
sheet flow.
When the car park is resurfaced, a 450x450mm drainage pit shall be installed and connected to the kerb adaptor on Swan Street.
The sealed carpark surface will grade toward the drainage pit.
Furthermore, when the car park is resurfaced it should be raised above the surrounding area (nominal 100mm), which will prevent
surface run off entering the carpark.
Please do not hesitate to contact our office should you wish to discuss this further.
195 Weyba Road SMP
7
Page 8
Kerb Adaptor 1
~15L/sec (Q100)
450x450 Grated Pit
in carpark surface,
location to be Direct Blue roof
confirmed, catchments to Kerb
connected kerb
adaptor 2. Adaptor 1
Underground100mm
PVC Pipe to Steel Kerb
Adaptor Direct Red roof
catchment to Kerb
Adaptor 2
Underground100mm (incl. carpark pit, 90m2)
PVC Pipe to Steel Kerb
Adaptor Location and size of downpipes to be confirmed
with architect.
Downpipes to be 100mm minimum diameter
Alignment of underground pipes shown is
indicative only. These can be altered.
Kerb Adaptor 2 New car park surface to fall toward the new pit.
~23L/sec (Q100)
Open areas to grade at 1% toward the road(s).
Kerb Adaptors to be placed 1m offset from lot
boundary.
Kerb Adaptors to be steel