 Noosa District Body Corporate Management, via Andrew Bock Architecture, engaged Black & More to prepare a Stormwater
 Management Plan (SMP) for the development at 195 Weyba Road, Noosaville. The SMP is required to meet Noosa Council’s
 development application requirements.
 An architectural drawing set containing existing building plans and proposed development plans was provided to Black & More.
 This SMP assess pre and post development roof water flows and informs the designers of required stormwater controls to meet
 Noosa Council’s Planning requirements.


 Existing Conditions
 Black & More undertook a site inspection to gain an appreciation of the stormwater drainage infrastructure of the site and the
 surrounding area.
 There are two independent structures on the site; a low set blockwork shop frontage and a high set structure which partially
 covers the low set structure. It is believed that these structures were constructed at different times, although their history is
 unknown. A car parking area is also present beneath the highset structure.


 Surrounding Drainage Infrastructure
 The surrounding streets have kerb and channel which
 flow to underground drainage lines, which outlet to the
 adjacent tributary. There is a highpoint at the corner of
 Weyba Road and Swan Street.
 This indicates kerb flows to the south along Swan Street
 and to the west along Weyba Road. These kerb flows
 are collected by drainage pits.
 See Figure 1 which shows the underground stormwater
 drains in green and the assumed highpoint.
 It is intended to discharge roof water to the kerb and the
 minor overland flows will sheet flow to the kerb.




                                                                             Figure 1 - Adjacent Drainage Infrastructure
                                                                            (Source: Noosa Council Interactive Mapping)




195 Weyba Road SMP
                                                                                                                                2
Log in to download the original file

RFI - Black & More - Stormwater Management Plan.pdf · 2.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.