RFI - Black & More - Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn20 March 2020 Our ref: 195 Weyba Road SMP File ref: 7465 [email protected] Noosa District Body Corporate Management Suite 9 41 Sunshine Beach Road Noosa Heads QLD 4567 Attention: Andrew Davidson Dear Andrew 195 WEYBA ROAD DEVELOPMENT STORMWATER MANAGEMENT PLAN Executive Summary This letter presents the stormwater management plan for the development at 195 Weyba Road. As part of the development there is a slight increase in roof area which results in an almost negligible amount of additional runoff. Black & More were informed that there is a requirement to maintain a maximum of 25L/sec out of each kerb adaptor, although the design event was not specified. Council planning scheme was also consulted for further requirements, specifically “PSP05 – Engineering Design Standards – Roads, Drainage and Earthworks”. It is proposed to install two kerb adaptors and evenly split roof water flows between them. Also, it is proposed to install a surface drainage pit in the covered car park, which will mainly address maintenance flows (i.e. flows from hose) but will also provide relief if flooding were to occur. The open areas will will maintain existing ground levels and grades. Any landscaping work will maintain a 1% grade toward the street and promote sheet flow. Please refer to the attached roof plan mark-up which detailed the proposed stormwater drainage measures. Please note the location of downpipes and underground pipes shown is indicative only and is to be confirmed with the architect. The location of the kerb adaptors, however, shall be 1m offset from the lot boundaries, as per Noosa Council’s design standards. Roof flows shall be split between the kerb outlets. These proposed measures will provide an overall improvement to the stormwater drainage of the site. Please do not hesitate to contact our office should you wish to discuss this further. Yours sincerely BLACK & MORE Peter Mathers Principal Civil Engineer Encl: Proposed Stormwater Mark-up www.blackm.com 7/28 Sunshine Beach Rd BRISBANE | CAIRNS | SUNSHINE COAST | TOOWOOMBA ABN: 19 609 960 232 PO Box 611 Ph: 07 5447 4444 Noosa Heads QLD 4567
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.