Original source · versioned page text
RFI - Black & More - Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Existing Roof Water Drainage
As can be seen in Figure 2 & 3, roof water from the highset structure is collected in downpipes which are then directed beneath
the highset structure and above the lowset structure to the carparking area (see Figures 5 & 6).
The roof water from the low set structure also falls to this area. This roof area could not be inspected; however, it is reasonable
to assume the roof water it collected into the same downpipes eventually. The downpipes then travel below ground and outlet
to the kerb on Swan Street. This was the only roof water outlet point observed.
Figure 2 – Roof Plan Mark-up of Roof Water Flows
Figure 3 - Ground Floor Mark-up of Existing Roof Water Drainage
195 Weyba Road SMP
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.