response to excavation code
Vegetative waste AO5.1 Complies - site is clear of vegetation
PO5 Cleared vegetation is transported
Vegetation cleared from a off-site for disposal in an approved green
development site is disposed of in an waste disposal facility.
environmentally responsible manner.
AO5.2
Cleared vegetation is mulched
on-site and reused for landscaping of the
finished development.
AO5.3
Cleared vegetation is disposed of for the
purpose of firewood.
AO5.4
Disposal of vegetative waste by burning
off is avoided.
Managing contamination risk AO6.1 Complies - earthworks in question is in
PO6 Fill material is solid clean earth, free of cut, not fill.
Materials used as fill are suitable for putrescible or refuse
development and future use of the land material, vegetation, acid sulfate
and filling or excavation works do not soils, building or construction material
result in the contamination of land. or other material or contaminants.
AO6.2
The site is not on the contaminated land
register.
Haulage activity and amenity No acceptable outcome provided -
PO7
Haulage of material to and from
a site ensures—
1. minimal disturbance to
neighbouring properties and
properties along the haulage
route; and
2. Council’s road infrastructure
including pavements is not
adversely affected.
Extent of earthworks AO8 Complies - all works are within the
PO8 All earthworks, including cut and fill property as shown on the attached
The layout of the development batters, retaining walls and the like are plans. The retaining walls and drainage
provides adequate, clearly defined
and easily accessible—
contained within the subject site. measures are located min 500mm within
the subject allotment
1. on-site vehicle parking and
manoeuvring areas; and
2. loading and manoeuvring areas
for delivery and service vehicles.
Sloping sites AO9 Non compliant - the extent of cut
PO9 Cut or fill is less than 1.5 metres in depth exceeds 1.5m (approx 1.6m proposed).
On sloping sites development follows relative to the natural ground level. This extent of earthworks is necessary
the natural landform wherever practical for this particular case as the work is
and excavation or filling is minimal. needed to maintain a complaint platform
and not undermine the existing
swimming pool towards the rear
boundary.