Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

response to excavation code

of 5

Page text shows just the words. Original shows the document exactly as it was published.

Infrastructure protection                    No acceptable outcome provided         -
PO10
Earthworks and vehicular access do not
adversely impact on the capacity, operations
and maintenance of existing infrastructure.
Environmental protection                 No acceptable outcome provided          -
PO11
Earthworks minimise any adverse impact
upon groundwater, watercourses,
drainage lines, wetlands, and
native vegetation.
Dams                                     AO12.1                                  Not applicable - the proposed
PO12                                     Where the site is in the Rural zone— development does not relate to a dam.
Dam location and construction does
not impact upon neighbouring
properties or road reserves, in terms     1. the land has a slope of less than
of—                                           25% (1:4);
                                          2. the earthworks including cut and
                                              fill batters and retaining walls
 1. hydrology;                                are setback a minimum of 50
 2. alteration of existing overland flow      metres from the property
     paths and patterns;                      boundary; and
 3. landslide or failure of dam wall;     3. the size of the lot is greater than
     and                                      5 hectares.
 4. effluent disposal areas.
                                         AO12.2
                                         Where the site is in the Rural
                                         residential zone or the Rural zone and
                                         the lot is less than 5 hectares:


                                             1. the land has a slope of less than
                                                1:6;
                                             2. the earthworks including cut and
                                                fill batters and retaining walls
                                                are setback a minimum of 20
                                                metres from the property
                                                boundary; and
                                             3. the dam work involves less than
                                                500m³ of material.

                                           AO12.3
                                           For all other zones—
                                           No acceptable outcome provided
Log in to download the original file

response to excavation code.pdf · 267 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.