~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
6 Sewerage Network Analysis
This section details the sewerage strategy and infrastructure required to service the proposed Noosa on
Weyba development.
Planning for the Noosa sewerage network was not available for this analysis. Discussion with Unitywater
staff had indicated that planning for the region was out-dated, having last been undertaken in 1996.
However, general consensus with Unitywater was that the network is generally adequate with little operating
issues. Requests for information regarding the Noosa sewerage network in the vicinity of the development
were made to Unitywater and catchment data was provided in order to undertake the analysis.
6.1 Servicing Strategy
The proposed development is within the Noosa Coastal sewerage scheme. This scheme consists of multiple
local catchments that discharge to the Noosa Heads STP.
The Noosaville Industrial catchment is a small local sewerage catchment containing three small pump
stations, discharging to a larger pump station (NVL011). This pump station discharges via a 200 mm
diameter rising main into the trunk gravity mains along Eenie Creek Road. Twin gravity mains convey flow
from the Noosaville Industrial and other catchments to a large pump station NVL040. NVL040 captures flow
from all catchments to the west of Eenie Creek and conveys flow via a 450 mm diameter rising main to the
Noosa heads STP.
It is proposed that the Noosa Weyba development would discharge to the Noosaville Industrial
on
catchment. An initial connection to NVL011 would be via a rising main from the site, with the development to
the west of the site proposed to discharge to the local gravity mains along Lake Entrance Boulevard.
6.2 Network Analysis
Unitywater provided all relevant data to undertake an assessment of the Noosaville Industrial catchment and
the primary conveyance infrastructure to the Noosa Heads STP. This included:
> Pump Station design data (wet well details, pump curves)
> Network GIS
-
Catchment populations
-
Gravity main and rising main data.
6.2.1 Pump Station NVL011
Pump station NVL011 services an existing population of approximately 2,060 EP with minimal growth
projected for the catchment, It will ultimately service 2,900 EP post 2026.
NVL011 pumps through a 200 mm diameter rising main and discharges to twin 600 mm and 525 mm
diameter gravity sewers.
The inclusion of the Noosa on Weyba 2,370 EP represents a doubling of the ultimate catchment population.
An analysis of pump station NVL011 and downstream infrastructure was undertaken to assess the impact of
the development.
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 29.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.