~,.., Carclno Water Supply and Sewerage Analysis
Noosa on Weyba
13 --- ------ -- -----------
----,-- --------------,
------ ------ - ------------- -- ---
------------,--"------’-------.--------------- -,-----------------,
I01118 --------~------ " , ,.
I I I "
" , "
I I " I ,
11.1- --
-------------~---------------- ________________._________________1...________________
I I
________________ ________________.________________.._________________1...________________.
, "
I I , "
I I , "
I I , "
" ",.
- - -------_----._--
----------------,. -------------,--------------- ----------------,-----------------.-----------------,----------------,
1
---~1-~~r-------.------- , ",.
10’4f
401111114 ,
,
""
",.
9.1 - - - - -
~’- - - - - - - - - - -- - -
4OM1’113- - - - - - -- --
-~-- - - - - --- -- -- --- -- -- --- - - -- - -- - - -- ------- - - -----
~ -----~- -~ -:
-- ---- ---- - - -------- ------ - - -- --- -- ------
401111112
; ;;;;
-----------,----------------- ---------------_!_----------------,-----------------,-----------------
1.8 -------- ------ --------_._-
"
----------------
’"
: 1111111: :::
, , ,
, ""
6.5-+- -
__:___ __ ___ _____ ________________ ----------------.-----------------1-----------------0---______________,
---5 6-- , ""
, ""
g ,
,
""
""
’’ 5.2 - -- -- ---- -- - - - -
~
,
- - - - -- -- -- -- -- - -
-;---
.
-- -- --
,
-,-----------------
,
----------------
’"
----------------j-----------------,-----------------,-----------------
."
~ ,
,
,
.
.
, ,
,
,
’"
,
,
,
,
, ,
!!: 3.9 - -- -- -- -- -- - - - -
~
- - - - -- -- -- -- -- - -
~-
- - - - - - - -- -- -- --
-,- - - - - - - - - - - - -- -
-,
-- - - - - - - - - - -- -- - -- -- -- - - - - - - - - - - -- -- -- -- - - -- - - - -
~
-- -- -- -- -- - - - - - -
~- - -- - - ---- -- -- - -
-~
-
---:
- - - - -- -- -- --
... "
: 401121115 ’:
ill 401121114 4Ot121113 :
’" 2.6 ----- - - ------------------ .------
--’ , , ,
40111\1111
1.3 - - - - - - - - - - - - - - -
~ - - - - - - - - - - - - - - - -
~- - - - - - - - - - - - - - - -
-;- - - - - - - - - - - - - - - ._--- ----------- ---- ------------
---,------------_._-.,--------------
, ,
-, --------------,
, . ,
, , , ,
, ,
0.0 f - - -- -- -- -- -- - - - -
~ - - - - -- -- -- -- -- -
-;- -- - - - - - -- -- -- --
-;- - - - - - - - - --- --
---~ .____ ___________ ____ ____________
___J_____________.__-’______________
, ,
, ,
12
13 ’
’14 _15
~ ~_
-1.3 t- - -- ---
---~----------------~-----------------;-----------------~ --- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, _ _ _, _
, , , ,
, , , , ,
::::r--------------t--------------t--------------:-----------------t----------------[----------------j----------------j---------------T------------
I I , ,
, , , ,
-5.2 + + + + t t
0.0 118.1 231.4 356.1 414.8 593.5 112.2 830.9 949.6 1068.3 1181,0
Distance (rn)
Figure 6-1 Eenie Creek Road Trunk Main Hydraulic Analysis Results
6.2.3 Pump Station NVL040
The twin gravity mains discharge into the existing major pump station NVL040. This pump station collects
flows from several local catchments and conveys flow via a 450 mm diameter rising main to the Noosa
Heads STP. It services an existing population of almost 19,600EP with an ultimate service population near
23,500EP.
The inclusion of the Noosa on Weyba 2,370EP represents a 10% increase in service population ultimately.
An analysis of this pump station and downstream infrastructure was undertaken to assess the impact of the
development.
The existing design details of NVL040 and its rising main are detailed in Table 6-3.
Table 6-3 NVL040 Design capacities
Velocity Headloss
Total Total Rising
Pump at Total at Total
Pump Power Main
Head1 Pump Pump
Existing Flow1 Rating1 Diameter
EP
capacity capacity
(Us) (m) (kW) (mm) (m/s) (m)
21,600 225.00 41.80 123.00 450.00 1.38 11.19
Note: 1. Based on Pump Curve CS32311735and design operating point
6.2.3.1 NVL040 including Noosa on Weyba
The addition of the Noosa on Weyba Development represents an increase in the ultimate catchment size of
about 10%. The increase in population does not trigger an augmentation to NVL040. It is expected that the
existing pump should be adequate to accommodate the increase in flow. However it would be operating at a
lower efficiency. Table 6-4 details the pump station requirements with the inclusion of the proposed
development.
Northbrook Corporation Pty, LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 15
[OCR of page images]
< Cardno Noosa on Weyba
Water Supply and Sewerage Analysis
Head/E levation (m)
2.6
13
00
AB
2.6
39
5.2
0.0 118.7 237.4 356.1 A748 593.5 12.2 830.9 949.6 1068.3
Distance (m)
Figure 6-1 Eenie Creek Road Trunk Main Hydraulic Analysis Results
6.2.3 Pump Station NVL040
The twin gravity mains discharge into the existing major pump station NVL040. This pump station collects
flows from several local catchments and conveys flow via a 450 mm diameter rising main to the Noosa
Heads STP. It services an existing population of almost 19,600EP with an ultimate service population near
23,500EP.
The inclusion of the Noosa on Weyba 2,370EP represents a 10% increase in service population ultimately.
An analysis of this pump station and downstream infrastructure was undertaken to assess the impact of the
development.
The existing design details of NVL040 and its rising main are detailed in Table 6-3.
Table 6-3 NVL040 Design capacities
Velocity Headloss
at Total at Total
Pump Pump
Total Rising
Pump -
fyi aul Head’ ET
Existing Flow ET ig
EP capacity capacity
(Lis) i) (mm) (mis) (m)
21,600 225.00 41.80 123.00 450.00 1.38 11.19
Note: 1. Based on Pump Curve CS3231 /735and design operating point
6.2.3.1 NVL040 including Noosa on Weyba
The addition of the Noosa on Weyba Development represents an increase in the ultimate catchment size of
about 10%. The increase in population does not trigger an augmentation to NVLO40. It is expected that the
existing pump should be adequate to accommodate the increase in flow. However it would be operating at a
lower efficiency. Table 6-4 details the pump station requirements with the inclusion of the proposed
development.
Northbrook Corporation Pty. Ltd Version 3 28 November 2012
5101-19 Commercial in Confidence Page 15
49/01/01
1187.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 29.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.