~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
Ultimate 23,474.31 244.50 21.00 78 450 1.08 15.15
Ultimate with
25,845.31 269 23.00 97 450 1.69 16.30
Development
6.3 Noosa on Weyba Network
An internal sewerage network to service the Noosa on Weyba development has been identified. It is noted
that in the SEQ Design and Construction Code, that a conventional system (i.e. gravity mains and pump
stations) are preferred over alternative strategies. However, with final lot configurations to be confirmed a
definitive internal network will be identified at a later date.
Alternative servicing strategies such as the use of low pressure sewers has been considered for this
development. For the purposes of this report a conventional system has been adopted, to demonstrate the
servicing strategy.
6.3.1 Gravity Mains
A network of gravity mains, ranging in size from 150 mm to 225 mm are required to service the development.
Analysis has indicated that the use of gravity mains at minimum grade will be able to service the
development.
Properties within Precinct 4 (MP005 Precincts J,K and L) are proposed to connected via 150 mm gravity
mains to the existing sewers along Lake Entrance Boulevard. The combined PWWF for these properties is
2.6L/s. The existing development along Lake Entrance Boulevard currently discharging to the existing 150
mm gravity main contribute approximately 4.6L/s at PWWF. The impact of these flows from the Noosa on
Weyba development on this network is expected to be minimal.
A small portion of development in Precinct 1 (MP005 Precinct A) is considerably lower than the surrounding
development. Servicing of this site may not be possible via gravity, as identified in Figure 2. A small grinder
pump servicing this site may be required, discharging to the nearest gravity main.
Detailed design will confirm the reticulation network design.
Figure 2 illustrates the proposed alignment of gravity mains in the development.
6.3.2 Pump Stations
Due to the topography of the site, several pump stations are required to convey flow to the external
connection. Three small pump stations required to service the development in Precinct 2 (MP005
are
Precincts B,D and E) on the south eastern corner of the development. With a larger pump station required to
convey flow to the external catchment. Consideration should be given to the local flood levels and pump
stations should be located above these identified levels where possible. Detailed design will confirm the
location of pump stations and rising main alignments.
Details of the pump station capacities and discharge rising main is detailed in Table 6-5.
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 29.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.