7 Conclusions
Based on the work undertaken for servicing the Noosa on Weyba development, a number of conclusions
have been made:
> The proposed development is approximately 2,730 EP and will comprise a mix of residential and non-
residential land uses on the site.
> The development is outside the current water supply and sewerage planning head works region and is
proposed to connect to the existing water supply and sewerage networks currently servicing Noosa.
> To provide water supply to the development it is proposed to connect to the Noosa Industrial DMA
(NIDMA)and serviced via the Tewantin Reservoirs.
>
Analysis undertaken by MWH on behalf of Unitywater indicated that the current NIDMA water supply
network has sufficient capacity to accommodate the development.
> To service the site, a connection to the existing 600mm diameter trunk main along Eenie Creek Road via
a 250 mm diameter main along Walter hay Drive is proposed.
> Consideration should be given to a connection to the existing 150 mm reticulation main in Lake Entrance
Boulevard to avoid dead end mains in the proposed network.
> An internal network of 200 mm and 150 mm diameter water mains will be required to service each site to
maintain Unitywater’s DSS.
> The conveyance of sewage from the site is proposed via the internal use of pump stations and local
reticulation mains. For the purposes of this study a conventional system has been identified, as per
Unitywater’s DSS.
> A Low pressure sewerage system may be considered depending on topography site constraints and
capacity at the Noosa STP. It is expected that the design flow with a low pressure system will be reduced
by at least 50%,should this system be adopted.
> A total of five pump stations are proposed. Four internal pumps will convey flow to a central pump station
to the north of the development.
> This main pump station will convey flow to the existing Noosa sewerage network and discharge to
existing pump station NVL011. The inclusion of the Noosa on Weyba development would trigger an
upgrade of this existing pump station
> The conveyance route from NVL011 follows the existing rising main and gravity network to the Noosa
STP. No further augmentation of the existing sewerage network was identified.
> While hydraulic capacity at the Noosa STP is sufficient, there is restriction in the BOD/COD capacity.
>
Unitywater has advised that the augmentation of the Noosa STP is proposed, with a completion date
scheduled for December 2015. It is expected that should the STP augmentations be completed, the STP
will be sufficient to accommodate loads from the Noosa on Weyba development
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 29.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.