([D)MWH. Noosa on Weyba Water Network Performance Assessment
1 Introduction
MWH have been engaged by Unitywater to undertake a water network performance assessment of the
proposed Noosa on Weyba development. Three initial supply options have been developed and are
included within the assessment brief prepared by Cardno (refer to Appendix A).
The proposed development is located off Old Hollett Road near Walter Hay Drive. It will be serviced
from within existing Noosa Industrial DMA (NIDMA) with storage provided at the Tewantin
the
Reservoirs. Option 1 is to connect a 300 mm diameter main into the existing 375 mm diameter trunk
main along Eenie Creek Road and serve as the primary connection to the development site. Options two
and three assessed the potential for a secondary 200 mm diameter connection from the existing
150 mm diameter main in Lake Entrance Boulevard. Details of the network layout for the three supply
options assessed can be found in the Cardno Report (Appendix A).
1.1 Methodology
The assessment has applied the following methodology:
The assessment has been carried out using H20MAP Water.
The demands (EPs)for the Noosa on Weyba development site were developed by Cardno and
adopted for use in the ’Unitywater Planning Model -
Water’. Demand was distributed to
junction/s at the boundary of the development.
The water network within the NIDMA was reviewed against the latest pipe GIS layer and the
model was updated to reflect the existing water network.
Fire flow demands were added to junctions within NIDMA and a fire flow assessment was run to
determine the critical fire flow junction.
The model was used to assess supply network performance for the three supply
the water
options. The network was assessed with
and without the proposed development under
maximum hour and fire flow demand conditions during the Ultimate planning horizon.
1.2 Assumptions
The performance assessment of the water supply network has been undertaken assuming the following:
The development demands for assessment were provided by Cardno along with calculations,
and assumptions. MWH have confirmed that demand conversion factors used are inline with the
Noosa Planning Scheme Policy and no revision is necessary.
Along with the "no-development" scenario, the three options proposed within the assessment
brief were the only options assessed.
Only the full development solution was assessed. No interim development stages were
investigated.
The assessment has provided results to the boundary of the development only. No internal
water supply network was investigated and internal water supply network head losses were not
assessed.
Status: Draft 22/06/2012
Project number: Page 1 Our ref: Noosa on Weyba WS Assessment.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 29.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.