Council archive · source document
Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208
Very large file (29.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
([D)MWH. Noosa on Weyba Water Network Performance Assessment
4.2 Fire Flow Pressure Performance
The fire flow assessment for all options identified pressures at the development site and within NIDMA
are predicted to remain above the required pressure of 12 m during 2/3 maximum hour in the Ultimate
planning horizon. 2/3 maximum hour was determined to be at 7pm and is calculated from the maximum
flow into NIDMA.
Fire flow demands were assigned to all junctions within NIDMA to determine the critical fire flow
junction. Fire Flow demand was assigned to junctions as follows:
Junctions with commercial demand 30 Us.
Junctions with residential demand 15 Us.
The critical fire flow junction was found to be near the end of Traders Lane behind 118 Noosa-Eumundi
Road (refer to Figure 4-1). Residual pressure at this location without the inclusion of the proposed
development is predicted at fire flow demand at the hydrant to be 21.12 m. The addition of the
development site is predicted to reduce pressures at the critical point to a minimum of 13.38 m at
Ultimate. The model predicts that with the development the catchment will still meet the standards of
service.
Pressure results identified at 7pm during the fire flow performance assessment are provided below in
Table 4-2.
Table 4-2: 2038 Fire Flow Pressure Performance at 2/3 Maximum Hour
NOOSA_ON_WEYBA_ NOOSA_ON_WEYBA_C
NTHWJ002350
CONN1 ONN2
Critical fire flow Connection #1 at Connection #2 at
junction within NIDMA development boundary development boundary
metres head
21.12
13.99 57.35
13.38 60.75 55.42
14.41 59.52
PASS PASS PASS
4.3 Storage Assesment
The Noosa on Weyba development will be supplied from the Noosaville Industrial DMA. This DMA is
one of a number of DMAs dependent on the Tewantin Reservoirs for storage as shown in Figure 4-2
(Tewantin.
Status: Draft 22/06/2012
Project number: Page 6 Our ref: Noosa on Weyba WS Assessment.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 29.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.