([D)MWH.                                          Noosa on Weyba Water Network Performance Assessment




  4.2             Fire Flow Pressure Performance
  The fire flow assessment for all options identified pressures at the development site and within NIDMA
   are predicted to remain above the required pressure of 12 m during 2/3 maximum hour in the Ultimate
   planning horizon. 2/3 maximum hour was determined to be at 7pm and is calculated from the maximum
  flow into NIDMA.

   Fire flow demands     were   assigned to all junctions within   NIDMA to determine the critical fire flow
  junction. Fire Flow demand was assigned to junctions as follows:
             Junctions with commercial demand      30 Us.

             Junctions with residential demand     15 Us.

  The critical fire flow junction was found to be near the end of Traders Lane behind 118 Noosa-Eumundi
  Road (refer to Figure 4-1). Residual pressure at this location without the inclusion of the proposed
  development is predicted at fire flow demand at the hydrant to be 21.12 m. The addition of the
  development site is predicted to reduce pressures at the critical point to a minimum of 13.38 m at
  Ultimate. The model predicts that with the development the catchment will still meet the standards of
  service.

   Pressure results identified at 7pm during the fire flow performance assessment are provided below in
  Table 4-2.

  Table 4-2: 2038 Fire Flow Pressure Performance at 2/3 Maximum Hour


                                                 NOOSA_ON_WEYBA_           NOOSA_ON_WEYBA_C
                          NTHWJ002350
                                                       CONN1                          ONN2


                          Critical fire flow       Connection #1 at            Connection #2 at
                       junction within NIDMA     development boundary      development boundary


                                                       metres head




                                21.12




                                13.99                   57.35



                                13.38                   60.75                         55.42



                                14.41                   59.52



                                PASS                    PASS                          PASS




  4.3             Storage Assesment
  The Noosa on Weyba development will be supplied from the Noosaville Industrial DMA. This DMA is
  one of a number of DMAs       dependent on the Tewantin Reservoirs for storage as shown in Figure 4-2
   (Tewantin.




  Status: Draft                                                                                             22/06/2012
   Project number:                                    Page 6                Our ref: Noosa on Weyba WS Assessment.docx

Used in these records

About this file

File size
29.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12_0208.pdf · 29.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.