Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208
Very large file (29.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
([D)MWH. Noosa on Weyba Water Network Performance Assessment
Minimum pressure results identified during the maximum hour performance assessment are provided
below in Table 4-1.
Table 4-1: 2038 Maximum Hour Pressure Performance
NOOSA_ON
NOOSA_ON_W
NOON246 NTHWJ002615 NOON111 WEYBA_CON
EYBA_CONN1 N2
Connection #1 at Connection #2 at
Critical Connection #2
the intersection Connection #1 the intersection
junction of Eenie Creek at development of Lake Entrance
at
within development
Road and Walter boundary Boulevard and
NIDMA boundary
Hay Drive Attenuatta Place
metres
47.09 64.78 64.6
39.83 57.28 54.81
39.19 56.62 54.16 57.12 57.12
40.15 57.68 55.92
PASS PASS PASS PASS PASS
Status: Draft 22/06/2012
Project number: Page 5 Our ref: Noosa on Weyba WS Assessment.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 29.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.