Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208

of 50

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (29.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

([D)MWH.                                        Noosa on Weyba Water Network Performance Assessment




   Minimum pressure results identified during the maximum hour performance assessment are provided
   below in Table 4-1.

  Table 4-1: 2038 Maximum Hour Pressure Performance


                                                                                             NOOSA_ON
                                                     NOOSA_ON_W
                     NOON246     NTHWJ002615                             NOON111             WEYBA_CON
                                                     EYBA_CONN1                                      N2


                                 Connection #1 at                     Connection #2 at
                      Critical                                                               Connection #2
                                 the intersection     Connection #1   the intersection
                     junction    of Eenie Creek      at development   of Lake Entrance
                                                                                                     at
                      within                                                                  development
                                 Road and Walter         boundary      Boulevard and
                      NIDMA                                                                     boundary
                                    Hay Drive                         Attenuatta Place


                                                             metres




                      47.09           64.78                                 64.6




                      39.83           57.28                  54.81



                      39.19           56.62                  54.16         57.12                   57.12



                      40.15           57.68                  55.92



                      PASS            PASS                   PASS          PASS                    PASS




  Status: Draft                                                                                       22/06/2012
   Project number:                                  Page 5            Our ref: Noosa on Weyba WS Assessment.docx

Used in these records

About this file

File size
29.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12_0208.pdf · 29.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.