Skip to the record
Accept no substitutions.

Council archive · source document

Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208

of 50

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (29.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

~,.., Carclno                                                                                                 Noosa on Weyba
                                                                                            Water Supply and Sewerage Analysis




3              Desired Standards of Service

Unitywater adopt the South East Queensland (SEQ)Planning Guidelines as the basis for water supply and
sewerage planning. Card no have adopted these guidelines to assess the Noosa on Weyba development.


3.1     Water Supply

The key aspects of the adopted Desired Standards of Service (DSS)for water supply planning are detailed in
Table 3-1.


Table 3-1      Adopted Water Supply Network Planning DSS
 Item                             Detail

 Peaking Factors

                                  280 LlEP/d.
 Average Day (AD)
                                  Based on 230 LlEP/d + allowance for leakage/losses (50 LlEP/d).


                                  Low/Medium Density      High            Density
 Category                                                                           Commercial/Industrial
                                  Residential             Residential


 Mean Day Maximum Month
                                  1.5                     1.5                       1.5
 (MDMM:AD)

 Peak Day (pD:AD)                 2                       2                         2


 Peak Hour (PH:PD)                2                       1.75                      1.4

                                  Detached Res (<= 3 stories)- 15Ls for 2hrs w background Demand highest of 2/3
                                  PH or AD

                                  Multi story Res => 4 levels   -
                                                                    30Lls for 4 hours w background Demand highest of
 Fire Fighting Flows
                                  2/3 PH or AD

                                  Commercial/Industrial buildings     -
                                                                          30Lls for 4 hours w background Demand of PH
                                  demand (between 10am and 4pm)

                                  21 m at property boundary (under normal operating conditions (PH))
 Minimum Pressure
                                  12m min at the main at the hydrant; Min of 6m




Northbrook Corporation Pty. LId                         Version 3                                           28 November 2012
5101-19                                          Commercial in Confidence                                              Page 6

Used in these records

About this file

File size
29.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12_0208.pdf · 29.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.