Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208

of 50

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (29.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

~,.., Carclno                                                                                        Noosa on Weyba
                                                                                   Water Supply and Sewerage Analysis




3.2     Sewerage
The adopted DSS for sewer is detailed in Table 3-2.


Table 3-2      Adopted Sewerage Network Planning DSS
 Item                                             Detail


 Average Dry Weather Flow (ADWF)                  180 LlEP/d


 Peak Wet Weather Flow (PWWF)                    900 LlEP/d

                                                  Minimum velocity @ PDWF 0.7 m/s

                                                  Maximum velocity @ PWWF 3 m/s
 Gravity Main Design Criteria

                                                  Depth of flow @ PWWF 0.75d of pipe diameter

                                                  Minimum [email protected] m/s


 Rising Main Design Criteria                      Preferred Velocity 1.0-1.5 m/s

                                                  Maximum velocity @ PWWF 2.5 m/s

                                                  For SPS with 2 pumps, EACH pump delivers minimum 5 x
                                                 ADWF

 Pump Station Design Criteria                     Overflows should not occur at flow < 5 x ADWF or C1 x
                                                 ADWF (whichever is the larger).

                                                 6hrs at ADWF of "in catchment storage




Northbrook Corporation Pty. LId                  Version 3                                         28 November 2012
5101-19                                   Commercial in Confidence                                            Page 7

Used in these records

About this file

File size
29.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12_0208.pdf · 29.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.