Appendix H - Biodiversity Code
Attached to the e-mail Multiple Housing Type 3 Retirement & Special Needs (48 units) - MCU18/0009.
Callaghan and Toth Consulting Engineers______________________________________________________
Biodiversity Overlay
resulting from clearing or construction activities by- The CEMP for the works will detail vegetation protection
a) clearly marking vegetation to be retained with requirements including stockpiling around retained
flagging tape; vegetation, access requirements, machinery access
b) installing protective fencing around the dripline of requirements etc.
the vegetation and avoid filling and excavation in
these fenced areas; and
c) ensuring stock piling, storage and vehicle parking
occur outside the identified vegetation areas;
AND
S14.4 Low impact construction techniques are used
around vegetation to minimise interference with the
vegetation.
Filling and excavation The proposed extension will require filling to achieve a
O15 Vegetation is not adversely impacted No solution provided. platform to construct Villas 3 to 6 and the
upon by earthworks and changes to the café/administration building. There is some limited
hydrological regime, including changes to excavation as shown on plan 1717 DA 04A (by Middap
ground water levels, flooding levels, run- Architecture Pty Ltd).
off and tidal hydraulics.
The proposed underground ECOAid detention tanks will
ensure that the stormwater flows from the developed site
will remain as per current conditions.
13.10 Vegetation management
Replanting and rehabilitation Area to be cleared includes:
O16 development provided for S16.1 Landscaping and rehabilitation complements • 5255m2 of native vegetation.
ecologically important areas to be and supports ecologically important habitats by- • Plus area of understorey clearing for bushfire
restored and enhanced through the a) utilising native plans of local origin; buffers: 2304m2
following measures- b) utilising suitable plant species identified in PSP3 – • Total Clearing = 7559m2
a) siting landscaped areas to landscaping Plants and Guidelines;
complement and enhance existing c) replicating adjacent remnant habitats, including The Rehabilitation Plans 1714-20 to 22 show the following
vegetation; understorey vegetation; areas:
b) removal of all species likely to displace d) creating or enhancing linkages between existing • Landscaping area = 2457m2 which will utilise local
native flora species or degrade fauna habitats; endemic species in accordance with PSP3.
habitat; e) avoiding the use of undesirable plant species • Retained vegetation area = 2936m2 which will
c) replanting and rehabilitating degraded listed in table 9.1 of PSP3 landscaping Plans and involve weed removal, and infill planting as
habitat; and Guidelines; and required.
d) replacing any vegetation removed with f) planting riparian zones to filter stormwater run-off • Bushfire Buffer Area = 2304m2 which will involve
suitable replacement vegetation of and provide for wildlife habitat; understorey clearing, weed management, native
local origin. vegetation groundcover maintenance.
AND • Offset Area rehabilitation = 7559m2 in Lomandra
S16.2 Vegetation removed is replaced with – Park – an area equivalent to the area of clearing +
a) plantings of equivalent area that replicate the area of understorey clearing for the bushfire
C:\Users\User\Documents\JOBS\C&T\1714 Carramar MCU\Correspondence\Correspondence\Biodiversity Overlay_CarramarExtension_final.docx pg. 13
pg. 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.