Original source · versioned page text
Appendix H - Biodiversity Code
Attached to the e-mail Multiple Housing Type 3 Retirement & Special Needs (48 units) - MCU18/0009.
Callaghan and Toth Consulting Engineers______________________________________________________
Biodiversity Overlay
and ridgelines is retained and enhanced; b) in gullies; The bushfire buffer will maintain the canopy species, and
AND c) along watercourses and drainage lines; and requires clearing of the understorey and pruning of any
O10 Vegetation which makes a positive d) within 10m of road reserves. branches within 5m of the edge of a building.
contribution to the streetscape or major
road network is retained. A buffer along the Cooroy Noosa Road will be maintained
and the proposed clearing should not greatly impact the
amenity of the surrounding properties as a section of
vegetation is to be retained and the adjacent vegetation in
Lomandra Park is to be retained and enhanced with weed
management and infill planting.
Habitat trees S11.1 No clearing of koala habitat trees greater than Habitat trees will require clearing to construct the villas
O11 Habitat trees (including dead trees) 4m in height or with a diameter greater than 100mm and potentially to achieve the Bushfire Buffer. Prior to
and recruitment habitat trees are at 1.3m above the ground; clearing an inventory of non-juvenile trees cleared will be
protected for native fauna habitat, where AND undertaken, and planting to offset this loss of habitat trees
practicable. S11.2 No clearing of other habitat trees or will generally be in accordance with the Queensland
recruitment habitat trees. Environmental Offsets Policy, in particular:
• Establish three new koala habitat trees for every
one ‘non juvenile’ tree removed.
Lake Macdonald N/A
O12 Vegetation within 400m of the full No solution provided.
ponded water within Lake Macdonald is
retained.
Steep slopes N/A
O13 Vegetation on steep slopes is No solution provided.
retained and managed to avoid erosion
and landslide and to protect natural
resources and values.
Engineering and site works No new roads are required.
O14 Development is sited and designed S14.1 Works, including roads, driveways, fences,
to – sewer lines and other infrastructure – The car parking will be located in existing cleared areas
a) provide adequate separation distance a) do not transect areas of vegetation; or i.e. mostly within the existing carpark footprint, stormwater
between the vegetation to be b) are co-located within a combined utility corridor; infrastructure will be above the Q100, pathways are
protected and the development to and located to minimise clearing of retained vegetation and do
avoid disturbing, destabilising and c) provide for fauna underpasses, speed reduction not traverse the area of retained vegetation. The north-
deoxygenating any tree or altering the devices and associated fencing, lighting and south vegetated corridor that is formed with Lomandra
drainage; warning signs, where appropriate; Park is mostly maintained, with clearing limited to that
b) avoid traversing or fragmenting AND required for Villas 3 to 6 and partial clearing for the
vegetation or habitats for significant S14.2 Development within or adjacent to areas of bushfire buffer.
flora or fauna species; and vegetation, incorporate fauna friendly fences;
c) avoid creating barriers to faunal AND During construction the retained vegetation will be clearly
movement. S14.3 Vegetation is protected from interference marked to ensure the retained vegetation is protected.
C:\Users\User\Documents\JOBS\C&T\1714 Carramar MCU\Correspondence\Correspondence\Biodiversity Overlay_CarramarExtension_final.docx pg. 12
pg. 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.