Original source · versioned page text
EASTERN BEACHES FORESHORE RESERVES MANAGEMENT PLAN - COMMUNITY CONSULTATION OVERVIEW AND PROPOSED CHANGES (Referred from Planning and Environment Committee dated 8 August 2023 - Item 5.1) · Attachment 1 EBFRMP 2023 Draft Final
Plans and drawings: the text below has words only, no drawings.
EBFRMP Management actions
The following actions are identified for implementation:
Prioritisation:
• Immediate: < 1 year
• Medium:1 year – 3 years
• Long: 3 years – 5 years
• Continuing: Commenced and ongoing.
Action Responsibility Priority
9.1. Update and implement ecological restoration plans Environmental Immediate
for all EBFRs. Services Continuing
9.2. Provide general community information about the Climate Change Immediate
values of vegetated foreshores and natural processes for Environmental
community climate change resilience online, on-reserve Services
and nearby.
9.3. Experiment with accelerated assisted natural bush Environmental Immediate
regeneration, vegetation rehabilitation and dune Services Continuing
rebuilding, especially at the seaward edge of dunes and Bushcare groups
foreshores.
9.4. Develop design standards for beach accesses and Infrastructure Immediate
coastal community infrastructure components. Services Continuing
9.5. Allocate emergency contingent ecology funds and Environmental Medium
resources as part of annual budget process to more Services
readily deploy bush regeneration and recovery activities
after severe weather and disaster events.
9.6. Develop an overarching beach access plan and Environmental Medium
maintenance plan for beach accesses and coastal Services
community infrastructure components. Infrastructure
Services
9.7. Conduct a review of existing beach accesses, Environmental Long
viewing platforms, signage, fencing, seat and other Services
community coastal infrastructure, in line with Noosa’s Infrastructure
Design Principles. Services
Review elements include; classification, location, use,
construction and maintenance, environmental impacts
and defects, overuse and new or moved beach accesses
where needed.
Measures
Measure Responsibility Timeframe
Conduct a desktop review of the extent of EBFR Environmental Every two years
vegetation every two years, using remote sensing data Services
collected under the Coastal Monitoring Plan. Vegetation
Climate Change
% cover.
Eastern Beaches Foreshore Reserves Management Plan 2023 Page 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.